Media
Image
Media Name
The fish habitat downstream of Site C has deepened channels for consistent water depth and embedded structures to provide safe resting places. | December 2023
Media
Image
Media Name
The tailrace gantry crane is on tracks so it can move along the tailrace deck to lift the draft tube maintenance gates. There are a total of 12 gates, each weighing about 40 tonnes. | December 2023
Media
Image
Media Name
Water flows into the turbine units through penstocks. On the right is the downstream end of a penstock where scaffolding is being removed. On the left is the entrance to a turbine unit. | December 2023
Media
Image
Media Name
The flexible coupling collar joins the downstream end of the penstock to the opening for the turbine unit so water can flow through and turn the turbine runner. | December 2023
Media
Image
Media Name
The generator floor of the powerhouse with units 6 through to 1. | December 2023
Media
Image
Media Name
The stator and rotor have been installed for the unit 3 generator. | December 2023
Order
1.00