Media
Image
![Workers are upgrading D.A. Thomas Road and building a day use area in Hudson’s Hope.](/sites/default/files/styles/large/public/2023-10/001-P3P8_APP_INT_EV_0908_HWY29_DJI_0258_20230909-1500x_0.jpg?itok=setSVOYR)
Media Name
Workers are upgrading D.A. Thomas Road and building a day use area in Hudson’s Hope. | September 2023
Caption
Workers are upgrading D.A. Thomas Road and building a day use area in Hudson’s Hope. | September 2023
Media
Image
![At Lynx Creek, crews are building a boat launch and day use area.](/sites/default/files/styles/large/public/2023-10/002-P3P8_APP_INT_EV_0908_HWY29_DJI_0265_20230909-1500x.jpg?itok=4XcveCSN)
Media Name
At Lynx Creek, crews are building a boat launch and day use area. | September 2023
Caption
At Lynx Creek, crews are building a boat launch and day use area. | September 2023
Media
Image
![Construction is underway for the Halfway River boat launch and day use area.](/sites/default/files/styles/large/public/2023-10/003-P3P8_APP_INT_EV_0908_HWY29_DJI_0286_20230909-1500x.jpg?itok=A5mQ0SuZ)
Media Name
Construction is underway for the Halfway River boat launch and day use area. | September 2023
Caption
Construction is underway for the Halfway River boat launch and day use area. | September 2023
Media
Image
![Fish habitat is being developed near Wilder Creek. The reservoir will be approximately two metres deep at this location.](/sites/default/files/styles/large/public/2023-10/004-P3P8_APP_INT_EV_DJI_20230908163842_0017_D_EVVP-Pano_20230908-1500x.jpg?itok=Jo_DuDb_)
Media Name
Fish habitat is being developed near Wilder Creek. The reservoir will be approximately two metres deep at this location. | September 2023
Caption
Fish habitat is being developed near Wilder Creek. The reservoir will be approximately two metres deep at this location. | September 2023
Media
Image
![The Site C dam is at its full height, which is the equivalent of a 22-storey building. When the reservoir is filled, the dam will direct water to the approach channel.](/sites/default/files/styles/large/public/2023-10/005-APP_CORE_TALDJI_20230914162053_0034_D_20230914-1500x.jpg?itok=dwvC6_KD)
Media Name
The Site C dam is at its full height, which is the equivalent of a 22-storey building. When the reservoir is filled, the dam will direct water to the approach channel. | September 2023
Caption
The Site C dam is at its full height, which is the equivalent of a 20-storey building. When the reservoir is filled, the dam will direct water to the approach channel. | September 2023
Media
Image
![Excavators have started removing the right bank coffer dam as work on the spillways and tailrace nears completion.](/sites/default/files/styles/large/public/2023-10/006-APP_CORE_TALDJI_20230914161117_0005_D_20230914-1500x.jpg?itok=SK4sK0a9)
Media Name
Excavators have started removing the right bank coffer dam as work on the spillways and tailrace nears completion. | September 2023
Caption
Excavators have started removing the right bank coffer dam as work on the spillways and tailrace nears completion. | September 2023
Media
Image
![Water will go through six penstocks into the powerhouse, then exit through the tailrace. The spillways on the left will safely pass flows from the reservoir.](/sites/default/files/styles/large/public/2023-10/007-APP_CORE_TALDJI_20230914161959_0030_D_20230914-1500x.jpg?itok=UYLST3bK)
Media Name
Water will go through six penstocks into the powerhouse, then exit through the tailrace. The spillways on the left will safely pass flows from the reservoir. | September 2023
Caption
Water will go through six penstocks into the powerhouse, then exit through the tailrace. The spillways on the left will safely pass flows from the reservoir. | September 2023
Media
Image
![Crews are finishing concrete placement for the tailrace erosion protection slabs. Workers are also excavating the interior of the right bank cofferdam and placing riprap.](/sites/default/files/styles/large/public/2023-10/008-APP_CORE_TALDJI_20230914161332_0011_D_20230914-1500x.jpg?itok=vpmNZQ_v)
Media Name
Crews are finishing concrete placement for the tailrace erosion protection slabs. Workers are also excavating the interior of the right bank cofferdam and placing riprap. | September 2023
Caption
Crews are finishing concrete placement for the tailrace erosion protection slabs. Workers are also excavating the interior of the right bank cofferdam and placing riprap. | September 2023
Media
Image
![When the Site C reservoir is filled, water will flow down the approach channel and enter through the intakes.](/sites/default/files/styles/large/public/2023-10/010-APP_CORE_TALDJI_20230914161834_0026_D_20230914-1500x.jpg?itok=JWU8a1ho)
Media Name
When the Site C reservoir is filled, water will flow down the approach channel and enter through the intakes. | September 2023
Caption
When the Site C reservoir is filled, water will flow down the approach channel and enter through the intakes. | September 2023
Media
Image
![Rip rap is one of the many protective layers in the approach channel where water will flow from the reservoir into the intakes.](/sites/default/files/styles/large/public/2023-10/011-APP_CORE_TALDJI_20230914161552_0019_D_20230914-1500x.jpg?itok=UOCuWYhW)
Media Name
Rip rap is one of the many protective layers in the approach channel where water will flow from the reservoir into the intakes. | September 2023
Caption
Rip rap is one of the many protective layers in the approach channel where water will flow from the reservoir into the intakes. | September 2023
Media
Image
![Turbine unit 1 is close to completion in the powerhouse.](/sites/default/files/styles/large/public/2023-10/001-PWH_EV_R5N_3259_20230920-1500x.jpg?itok=Wfz-qJfF)
Media Name
Turbine unit 1 is close to completion in the powerhouse. | September 2023
Caption
Turbine unit 1 is close to completion in the powerhouse. | September 2023
Media
Image
![Turbine units 2 through 6 in the powerhouse are at varying stages of completion.](/sites/default/files/styles/large/public/2023-10/002-PWH_EV_R5N_3269_20230920-1500x.jpg?itok=2iQlMmYf)
Media Name
Turbine units 2 through 6 in the powerhouse are at varying stages of completion. | September 2023
Caption
Turbine units 2 through 6 in the powerhouse are at varying stages of completion. | September 2023
Media
Image
![Work on turbine unit 2 is ongoing with the installation of the bottom ring runner and turbine shaft, and stator stacking.](/sites/default/files/styles/large/public/2023-10/003-PWH_EV_R5N_3318_20230920-1500x.jpg?itok=XOu1mqEM)
Media Name
Work on turbine unit 2 is ongoing with the installation of the bottom ring runner and turbine shaft, and stator stacking. | September 2023
Caption
Work on turbine unit 2 is ongoing with the installation of the bottom ring runner and turbine shaft, and stator stacking. | September 2023
Media
Image
![The second-stage concrete has been poured on turbine unit 4. Next is installation of the stator frame.](/sites/default/files/styles/large/public/2023-10/004-PWH_EV_R5N_3342_20230920-1500x.jpg?itok=pH1blZfk)
Media Name
The second-stage concrete has been poured on turbine unit 4. Next is installation of the stator frame. | September 2023
Caption
The second-stage concrete has been poured on turbine unit 4. Next is installation of the stator frame. | September 2023
Media
Image
![Water will flow inside this spiral case and spin a turbine to generate electricity.](/sites/default/files/styles/large/public/2023-10/005-PWH_EV_R5N_3501_20230920-1500x.jpg?itok=xkZ25u3k)
Media Name
Water will flow inside this spiral case and spin a turbine to generate electricity. | September 2023
Caption
Water will flow inside this spiral case and spin a turbine to generate electricity. | September 2023
Media
Image
![The lower section of turbine unit 1, which is nearing completion.](/sites/default/files/styles/large/public/2023-10/006-PWH_EV_R5N_3532-Pano_20230920-1500x.jpg?itok=6VMZyvDZ)
Media Name
The lower section of turbine unit 1, which is nearing completion. | September 2023
Caption
The lower section of turbine unit 1, which is nearing completion. | September 2023
Media
Image
![These two sections will be connected to allow water to flow from a penstock unit on the right into a turbine unit on the left.](/sites/default/files/styles/large/public/2023-10/007-PWH_EV_R5N_3478_20230920-1500x.jpg?itok=u_wYgsFG)
Media Name
These two sections will be connected to allow water to flow from a penstock unit on the right into a turbine unit on the left. | September 2023
Caption
These two sections will be connected to allow water to flow from a penstock unit on the right into a turbine unit on the left. | September 2023
Media
Image
![As water leaves the powerhouse on the left, it enters the tailrace where it is slowed before being directed downstream to continue the river flow.](/sites/default/files/styles/large/public/2023-10/008-PWH_EV_R5N_3379_20230920-1500x.jpg?itok=RL0Lr93k)
Media Name
As water leaves the powerhouse on the left, it enters the tailrace where it is slowed before being directed downstream to continue the river flow. | September 2023
Caption
As water leaves the powerhouse on the left, it enters the tailrace where it is slowed before being directed downstream to continue the river flow. | September 2023
Media
Image
![The first of three sets of transformers are on their foundations. They need to be filled with oil before commissioning starts.](/sites/default/files/styles/large/public/2023-10/009-PWH_EV_R5N_3648-Pano_20230920-1500x.jpg?itok=FEIjjQGK)
Media Name
The first of three sets of transformers are on their foundations. They need to be filled with oil before commissioning starts. | September 2023
Caption
The first of three sets of transformers are on their foundations. They need to be filled with oil before commissioning starts. | September 2023
Media
Image
![The first of nine transformers is being assembled in the transformer yard.](/sites/default/files/styles/large/public/2023-10/010-PWH_EV_R5N_3643_20230920-1500x.jpg?itok=r0TjZw7Q)
Media Name
The first of nine transformers is being assembled in the transformer yard. | September 2023
Caption
The first of nine transformers is being assembled in the transformer yard. | September 2023
Media
Image
![When the reservoir is filled, the earthfill dam (at centre) will direct water to the approach channel on the right.](/sites/default/files/styles/large/public/2023-10/011-0926_SiteC_sus_livin-34-1500x.jpg?itok=WcC9R8_R)
Media Name
When the reservoir is filled, the earthfill dam (at centre) will direct water to the approach channel on the right. | September 2023
Caption
When the reservoir is filled, the earthfill dam (at centre) will direct water to the approach channel on the right. | September 2023
Media
Image
![Water will flow down the approach channel on the left and through the intake gates to the right.](/sites/default/files/styles/large/public/2023-10/012-0926_SiteC_sus_livin-37-1500x.jpg?itok=xZgdx5Nn)
Media Name
Water will flow down the approach channel on the left and through the intake gates to the right. | September 2023
Caption
Water will flow down the approach channel on the left and through the intake gates to the right. | September 2023
Media
Image
![This new fish habitat is being constructed in a side channel downstream of the dam.](/sites/default/files/styles/large/public/2023-10/013-0926_SiteC_sus_livin-40-1500x.jpg?itok=sX4i5IW6)
Media Name
This new fish habitat is being constructed in a side channel downstream of the dam. | September 2023
Caption
This new fish habitat is being constructed in a side channel downstream of the dam. | September 2023
Media
Image
![A fish habitat channel downstream of the dam is deep to prevent fish getting stranded in low water. There are structures placed along the channel where fish can feed and rest.](/sites/default/files/styles/large/public/2023-10/014-0926_SiteC_sus_livin-43-1500x.jpg?itok=9W_JQXze)
Media Name
A fish habitat channel downstream of the dam is deep to prevent fish getting stranded in low water. There are structures placed along the channel where fish can feed and rest. | September 2023
Caption
A fish habitat channel downstream of the dam is deep to prevent fish getting stranded in low water. There are structures placed along the channel where fish can feed and rest. | September 2023
Media
Image
![On the upstream side of the generating station, water flows from the approach channel into the six intake units.](/sites/default/files/styles/large/public/2023-10/015-AFDE-COM-MED-019552%5B0%5D-1500x.jpg?itok=tucX_UG2)
Media Name
On the upstream side of the generating station, water flows from the approach channel into the six intake units. | September 2023
Caption
On the upstream side of the generating station, water flows from the approach channel into the six intake units. | September 2023
Media
Image
![Trash racks are installed at the inlet portals on units 1 to 3. These screens protect the turbine units by stopping debris from entering the intakes.](/sites/default/files/styles/large/public/2023-10/016-AFDE-COM-MED-019553%5B0%5D-1500x.jpg?itok=z6YHxn6T)
Media Name
Trash racks are installed at the inlet portals on units 1 to 3. These screens protect the turbine units by stopping debris from entering the intakes. | September 2023
Caption
Trash racks are installed at the inlet portals on units 1 to 3. These screens protect the turbine units by stopping debris from entering the intakes. | September 2023
Media
Image
![A waterproof liner is installed on the buttress wall.](/sites/default/files/styles/large/public/2023-10/017-AFDE-COM-MED-019554%5B0%5D-1500x.jpg?itok=CUVPDEXO)
Media Name
A waterproof liner is installed on the buttress wall. | September 2023
Caption
A waterproof liner is installed on the buttress wall. | September 2023
Media
Image
![A boat access ramp is being constructed on the downstream side of the earth fill dam.](/sites/default/files/styles/large/public/2023-10/018-AFDE-COM-MED-019582%5B0%5D-1500x.jpg?itok=sfAN3zEa)
Media Name
A boat access ramp is being constructed on the downstream side of the earth fill dam. | September 2023
Caption
A boat access ramp is being constructed on the downstream side of the earth fill dam. | September 2023
Media
Image
![A downstream side view shows Site C’s spillways, penstocks, powerhouse, and tailrace.](/sites/default/files/styles/large/public/2023-10/019-0926_SiteC_sus_livin-57-1500x.jpg?itok=EyA9lzGm)
Media Name
A downstream side view shows Site C’s spillways, penstocks, powerhouse, and tailrace. | September 2023
Caption
A downstream side view shows Site C’s spillways, penstocks, powerhouse, and tailrace. | September 2023
Media
Image
![Site C has two mechanical spillways and an auxiliary spillway to safely pass flows from the reservoir. The right bank cofferdam in front will be removed when the dam is in operation.](/sites/default/files/styles/large/public/2023-10/020-AFDE-COM-MED-019583%5B0%5D-1500x.jpg?itok=usb0Zk92)
Media Name
Site C has two mechanical spillways and an auxiliary spillway to safely pass flows from the reservoir. The right bank cofferdam in front will be removed when the dam is in operation. | September 2023
Caption
Site C has two mechanical spillways and an auxiliary spillway to safely pass flows from the reservoir. The right bank cofferdam in front will be removed when the dam is in operation. | September 2023
Media
Image
![Tailrace construction is nearing completion.](/sites/default/files/styles/large/public/2023-10/021-0926_SiteC_sus_livin-61-1500x.jpg?itok=G1wfVKE9)
Media Name
Tailrace construction is nearing completion. | September 2023
Caption
Tailrace construction is nearing completion. | September 2023
Media
Image
![The permanent fish passage at the west end of the tailrace wall will allow fish to migrate upstream and fulfil portions of their lifecycles.](/sites/default/files/styles/large/public/2023-10/022-0926_SiteC_sus_livin-64-1500x.jpg?itok=BFdVL0rE)
Media Name
The permanent fish passage at the west end of the tailrace wall will allow fish to migrate upstream and fulfil portions of their lifecycles. | September 2023
Caption
The permanent fish passage at the west end of the tailrace wall will allow fish to migrate upstream and fulfil portions of their lifecycles. | September 2023
Media
Image
![The blue draft tube maintenance gates close the tailrace with a watertight seal for maintenance.](/sites/default/files/styles/large/public/2023-10/023-0926_SiteC_sus_livin-65-1500x.jpg?itok=QCOr4tV2)
Media Name
The blue draft tube maintenance gates close the tailrace with a watertight seal for maintenance. | September 2023
Caption
The blue draft tube maintenance gates close the tailrace with a watertight seal for maintenance. | September 2023
Order
4.00