Snow covers the site of the future Halfway River boat launch, located on the east side of the Halfway River Bridge. | December 2022
Media
Image
Media Name
The new Lynx Creek east segment of the Highway 29 realignment. | December 2022
Media
Image
Media Name
The new Cache Creek Bridge on Highway 29 opened to traffic on December 1, 2022. | December 2022
Media
Image
Media Name
The new Cache Creek segment of the Highway 29 realignment. | December 2022
Media
Image
Media Name
The operating ring and wicket gate levers are assembled for generating unit 1. | December 2022
Media
Image
Media Name
The fifth of six turbine runners is brought to Site C over frozen roads. | December 2022
Media
Image
Media Name
The 165 tonne turbine runner will be installed in the powerhouse. The blades of the turbine runner spin at high speed to take the maximum energy from water. | December 2022
Media
Image
Media Name
The Lynx Creek east embankment and newly-completed Highway 29 realignment seen at the left. | December 2022