East-facing view over the approach channel. | August 2022
Media
Image
Media Name
Intake gates four and five. | August 2022
Media
Image
Media Name
Work underway on the gate guides for the first radial gate. | August 2022
Media
Image
Media Name
Concrete placement on the right wall adjacent to the auxiliary spillway. | August 2022
Media
Image
Media Name
Upstream view of the spillways and penstocks, with the approach channel behind. The powerhouse and operation building is in front of the penstocks. | August 2022
Media
Image
Media Name
From left, penstock units six through one behind the powerhouse and operations building. Foundation enhancement work is ongoing at the tailrace in front. | August 2022
Media
Image
Media Name
Finishing concrete and plugging formwork holes on the right spillway training wall. | August 2022
Media
Image
Media Name
Grouting and patching the roller compacted concrete dam and core buttress where the liner will be attached. | August 2022
Media
Image
Media Name
Transmission towers are installed to connect the Site C substation to the dam. | August 2022
Media
Image
Media Name
A crane lifts the tower segment into position so it can be attached. | August 2022
Media
Image
Media Name
The 85th Ave industrial land, the primary source of glacial till used to build the dam, excavated to final elevation. | August 2022
Media
Image
Media Name
The Cache Creek Bridge deck after concrete pour completion. | August 2022
Media
Image
Media Name
Installing rebar for the expansion joint on the west abutment of the Cache Creek Bridge. | August 2022
Media
Image
Media Name
Ground preparation underway to build the Halfway River boat launch. | August 2022
Media
Image
Media Name
Final paving at Farrell Creek east. | August 2022
Media
Image
Media Name
The final layer of concrete is poured on the Farrell Creek Bridge the night of August 16. | August 2022
Media
Image
Media Name
A concrete pumper pours concrete to lay the final layer on the Farrell Creek Bridge deck. | August 2022
Media
Image
Media Name
First traffic on the Dry Creek Bridge. | August 2022
Media
Image
Media Name
Sub-base installed for the Lynx Creek boat launch. | August 2022
Media
Image
Media Name
Preparing for the final concrete deck pour on the Cache Creek Bridge. | August 2022
Media
Image
Media Name
A trial run for the sixth concrete deck pour on the Farrell Creek Bridge. | August 2022
Media
Image
Media Name
Cleaning precast panels and rebar before concrete is poured for the Farrell Creek Bridge deck. | August 2022
Media
Image
Media Name
Pouring concrete on the Farrell Creek Bridge deck. | August 2022
Media
Image
Media Name
Screeding concrete for the final driving surface on the Farrell Creek Bridge. | August 2022
Media
Image
Media Name
North-facing view of the Dry Creek bridge. | August 2022
Media
Image
Media Name
Completed surface deck of the Dry Creek bridge. | August 2022
Media
Image
Media Name
Road alignment construction on the Lynx Creek east embankment as traffic is detoured. | August 2022
Media
Image
Media Name
Lynx Creek bridge viewed from the existing Highway 29. | August 2022
Media
Image
Media Name
Removing parapet formwork from the Lynx Creek bridge. | August 2022
Media
Image
Media Name
Building a spawning shoal at Maurice Creek on the Peace River. | August 2022
Media
Image
Media Name
Spillways and stilling basin. | August 2022
Media
Image
Media Name
Tailrace at the powerhouse and operations building where foundation enhancement work is taking place. | August 2022
Media
Image
Media Name
Preparing and installing formwork for the walls of the permanent upstream fish passage. | August 2022
Media
Image
Media Name
Foundation enhancement work in front of the tailrace. | August 2022
Media
Image
Media Name
Upstream view of crews working on the right spillway wall. | August 2022
Media
Image
Media Name
Overview of the south portion of the approach channel. | August 2022
Media
Image
Media Name
In the approach channel, mudslabs have been placed against the dam and core roller compacted concrete buttress. | August 2022
Media
Image
Media Name
Setting up the gate-guides for a high-level radial gate in the spillway. | August 2022
Media
Image
Media Name
Close shot of gate guide installation. | August 2022
Media
Image
Media Name
Building transmission towers to connect the generating station to the Site C substation. | August 2022
Media
Image
Media Name
Penstock units 6 through 1, units 1-3 and unit 6 are encased in concrete; work is ongoing to complete units 4 & 5. | August 2022
Media
Image
Media Name
Penstock unit concrete encasement formwork and rebar. | August 2022
Media
Image
Media Name
Close up of the unit 1 and 2 rotors. | August 2022
Media
Image
Media Name
Progress on unit 1 stator core assembly. | August 2022
Media
Image
Media Name
Machining the embedded parts on unit 1. | August 2022
Media
Image
Media Name
Concrete work taking place at the unit 2 generator pit. | August 2022
Media
Image
Media Name
A wide view of main service bay and units 5 through 1. | August 2022
Media
Image
Media Name
Rebar installation for unit 3 spiral case. | August 2022
Media
Image
Media Name
Unit 4 spiral case and upper pit liner. | August 2022
Media
Image
Media Name
Unit 5 spiral case completed. | August 2022
Media
Image
Media Name
Assembly of unit 6 spiral case. | August 2022
Media
Image
Media Name
Electrical gear on the generator floor downstream, with poly wall and tarps for dust control during construction. | August 2022
Media
Image
Media Name
Spiral case pressurization skid used to control water pressure inside the spiral case during embedment. | August 2022
Media
Image
Media Name
Unit 5 spiral case is prepared for inlet bulkhead installation. | August 2022
Media
Image
Media Name
The unit 6 spiral case at left, and unit 6 penstock at right. | August 2022
Media
Image
Media Name
Dewatering gallery. | August 2022
Media
Image
Media Name
Right bank foundation enhancement tailrace excavation and fishway construction. | August 2022
Media
Image
Media Name
North-facing view of the permanent upstream fishway. | August 2022