Media
Image
![South-facing view of the dam. | July 2022](/sites/default/files/styles/large/public/2022-10/03-0704_BCH_STC_PANO_-4-1500x.jpg?itok=OzxSpUy8)
Media Name
South-facing view of the dam. | July 2022
Caption
South-facing view of the dam. | July 2022
Media
Image
![North-facing view of dam construction. | July 2022](/sites/default/files/styles/large/public/2022-10/04-0704_BCH_STC_GSS-9-1500x.jpg?itok=rMf-QJD8)
Media Name
North-facing view of dam construction. | July 2022
Caption
North-facing view of dam construction. | July 2022
Media
Image
![Dam intakes, as seen over the approach channel. | July 2022](/sites/default/files/styles/large/public/2022-10/05-0704_BCH_STC_GSS-10-1500x.jpg?itok=7DT_9cMp)
Media Name
Dam intakes, as seen over the approach channel. | July 2022
Caption
Dam intakes, as seen over the approach channel. | July 2022
Media
Image
![Construction of the spillway upper headworks and stilling basin. |July 2022](/sites/default/files/styles/large/public/2022-10/01-BC_Hydro%20Site_C%20Re-tile_0712_GSS_-EVVP15961596-1500x.jpg?itok=MtWskdML)
Media Name
Construction of the spillway upper headworks and stilling basin. |July 2022
Caption
Construction of the spillway upper headworks and stilling basin. |July 2022
Media
Image
![Spillway headworks and west stilling basin chutes. | July 2022](/sites/default/files/styles/large/public/2022-10/02-BC_Hydro%20Site_C%20Re-tile_0712_GSS_-EVVP16011601-1500x.jpg?itok=4N5PoeZl)
Media Name
Spillway headworks and west stilling basin chutes. | July 2022
Caption
Spillway headworks and west stilling basin chutes. | July 2022
Media
Image
![Crews install rebar at the left stilling basin. | July 2022](/sites/default/files/styles/large/public/2022-10/03-BC_Hydro%20Site_C%20Re-tile_0712_GSS_-EVVP16541654-1500x.jpg?itok=rRGR7mBb)
Media Name
Crews install rebar at the left stilling basin. | July 2022
Caption
Crews install rebar at the left stilling basin. | July 2022
Media
Image
![Workers install rebar at the permanent upstream fish passage. | July 2022](/sites/default/files/styles/large/public/2022-10/04-BC_Hydro%20Site_C%20Re-tile_0712_GSS_-EVVP16221622-1500x.jpg?itok=OYbTKItN)
Media Name
Workers install rebar at the permanent upstream fish passage. | July 2022
Caption
Workers install rebar at the permanent upstream fish passage. | July 2022
Media
Image
![Building the Lynx Creek boat launch near the Lynx Creek Highway 29 realignment. | July 2022](/sites/default/files/styles/large/public/2022-10/07-BCH_DRONE_LYNX_22071514460715_HWY29_DJI_0033-1500x.jpg?itok=lNRYZJD8)
Media Name
Building the Lynx Creek boat launch near the Lynx Creek Highway 29 realignment. | July 2022
Caption
Building the Lynx Creek boat launch near the Lynx Creek Highway 29 realignment. | July 2022
Media
Image
![Progress on the Hudson’s Hope shoreline protection berm. | July 2022](/sites/default/files/styles/large/public/2022-10/BCH_DRN_HWY29_HH_BERM22071611320716_HWY29_BERM_DJI_0005-1500x.jpg?itok=If-I4ln0)
Media Name
Progress on the Hudson’s Hope shoreline protection berm. | July 2022
Caption
Progress on the Hudson’s Hope shoreline protection berm. | July 2022
Media
Image
![Concrete deck pour completed for the Lynx Creek Bridge on Highway 29. | July 2022](/sites/default/files/styles/large/public/2022-10/-02-BCH_LYNX_2207211354_DJI_0533-1500x.jpg?itok=3biIFY8J)
Media Name
Concrete deck pour completed for the Lynx Creek Bridge on Highway 29. | July 2022
Caption
Concrete deck pour completed for the Lynx Creek Bridge on Highway 29. | July 2022
Media
Image
![Construction at the Lynx Creek boat launch. | July 2022](/sites/default/files/styles/large/public/2022-10/03-BCH_LYNX_2207211326_DJI_0524-1500x.jpg?itok=3cODq2sY)
Media Name
Construction at the Lynx Creek boat launch. | July 2022
Caption
Construction at the Lynx Creek boat launch. | July 2022
Media
Image
![East-facing view at the tie-in for the approach to the Halfway River Bridge and approach for the future boat launch. | July 2022](/sites/default/files/styles/large/public/2022-10/04-BCH_CACHE_DRN_2207211537_DJI_0537-1500x.jpg?itok=mIcM_1W2)
Media Name
East-facing view at the tie-in for the approach to the Halfway River Bridge and approach for the future boat launch. | July 2022
Caption
East-facing view at the tie-in for the approach to the Halfway River Bridge and approach for the future boat launch. | July 2022
Media
Image
![An aerial view across the 85th Ave industrial lands where glacial till is sourced and used to build the dam. | July 2022](/sites/default/files/styles/large/public/2022-10/06-BCH_85TH_2207220757_0722_85TH_CONV_DJI_0011-1500x.jpg?itok=5aQr2ZAF)
Media Name
An aerial view across the 85th Ave industrial lands where glacial till is sourced and used to build the dam. | July 2022
Caption
An aerial view across the 85th Ave industrial lands where glacial till is sourced and used to build the dam. | July 2022
Media
Image
![Aerial view of the P6 fish habitat enhancement project. | July 2022](/sites/default/files/styles/large/public/2022-10/07-BCH10220725DJI_0609LowRez-1500x.jpg?itok=RPsykVjH)
Media Name
Aerial view of the P6 fish habitat enhancement project. | July 2022
Caption
Aerial view of the P6 fish habitat enhancement project. | July 2022
Media
Image
![Panorama view, looking downstream over the diversion tunnel inlet portals at left, the dam in the centre, and the approach channel on the right. | July 2022](/sites/default/files/styles/large/public/2022-10/08-BCH11220725DJI_0645-PanoLowRez-1500x.jpg?itok=bW-qYWlA)
Media Name
Panorama view, looking downstream over the diversion tunnel inlet portals at left, the dam in the centre, and the approach channel on the right. | July 2022
Caption
Panorama view, looking downstream over the diversion tunnel inlet portals at left, the dam in the centre, and the approach channel on the right. | July 2022
Media
Image
![Panorama view of the powerhouse and generating station at left centre with the dam under construction at right centre. Excavators source aggregate from the river in front of the dam. | July 2022](/sites/default/files/styles/large/public/2022-10/09-BCH11220725DJI_0658-PanoLowRez-1500x.jpg?itok=hO-3PYym)
Media Name
Panorama view of the powerhouse and generating station at left centre with the dam under construction at right centre. Excavators source aggregate from the river in front of the dam. | July 2022
Caption
Panorama view of the powerhouse and generating station at left centre with the dam under construction at right centre. Excavators source aggregate from the river in front of the dam. | July 2022
Media
Image
![An upstream view over the approach channel, spillway upper headworks, intake gates, and roller compacted concrete buttress. | July 2022](/sites/default/files/styles/large/public/2022-10/010-BCH11220725DJI_0630LowRez-1500x.jpg?itok=gFfMRpM8)
Media Name
An upstream view over the approach channel, spillway upper headworks, intake gates, and roller compacted concrete buttress. | July 2022
Caption
An upstream view over the approach channel, spillway upper headworks, intake gates, and roller compacted concrete buttress. | July 2022
Media
Image
![Construction at the approach channel in the foreground with the roller compacted concrete buttress in front of the dam at left. | July 2022](/sites/default/files/styles/large/public/2022-10/011-BCH11220725DJI_0653LowRez-1500x.jpg?itok=PmPUut1J)
Media Name
Construction at the approach channel in the foreground with the roller compacted concrete buttress in front of the dam at left. | July 2022
Caption
Construction at the approach channel in the foreground with the roller compacted concrete buttress in front of the dam at left. | July 2022
Media
Image
![Aerial view over the spillways and stilling basin, with the penstocks behind the powerhouse and operations building. | July 2022](/sites/default/files/styles/large/public/2022-10/012-BCH11220725DJI_0703LowRez-1500x.jpg?itok=AQv27OiU)
Media Name
Aerial view over the spillways and stilling basin, with the penstocks behind the powerhouse and operations building. | July 2022
Caption
Aerial view over the spillways and stilling basin, with the penstocks behind the powerhouse and operations building. | July 2022
Media
Image
![Aerial view of the upstream end of Hudson’s Hope berm. | July 2022](/sites/default/files/styles/large/public/2022-10/01-STC_DJI_0030_20220726-1500x.jpg?itok=uVnxvGwu)
Media Name
Aerial view of the upstream end of Hudson’s Hope berm. | July 2022
Caption
Aerial view of the upstream end of Hudson’s Hope berm. | July 2022
Media
Image
![Panorama showing construction progress on the Hudson’s Hope berm. | July 2022](/sites/default/files/styles/large/public/2022-10/02-STC_DJI_0036-Pano_20220726-1500x.jpg?itok=QJ3VjVg7)
Media Name
Panorama showing construction progress on the Hudson’s Hope berm. | July 2022
Caption
Panorama showing construction progress on the Hudson’s Hope berm. | July 2022
Media
Image
![Aerial view of construction on the Lynx Creek boat launch parking area. | July 2022](/sites/default/files/styles/large/public/2022-10/03-STC_DJI_0047_20220726-1500x.jpg?itok=f4DdGpN9)
Media Name
Aerial view of construction on the Lynx Creek boat launch parking area. | July 2022
Caption
Aerial view of construction on the Lynx Creek boat launch parking area. | July 2022
Media
Image
![Aerial view of construction taking place for the Lynx Creek highway alignment. | July 2022](/sites/default/files/styles/large/public/2022-10/04-STC_DJI_0054_20220726-1500x.jpg?itok=rPntzh1S)
Media Name
Aerial view of construction taking place for the Lynx Creek highway alignment. | July 2022
Caption
Aerial view of construction taking place for the Lynx Creek highway alignment. | July 2022
Media
Image
![Aerial view of Farrell Creek bridge construction, showing bridge deck concrete and rebar progress. | July 2022](/sites/default/files/styles/large/public/2022-10/05-STC_DJI_0058_20220726-1500x.jpg?itok=R08Hf8cD)
Media Name
Aerial view of Farrell Creek bridge construction, showing bridge deck concrete and rebar progress. | July 2022
Caption
Aerial view of Farrell Creek bridge construction, showing bridge deck concrete and rebar progress. | July 2022
Media
Image
![A view of the east tie-in on Highway 29 at Halfway River. | July 2022](/sites/default/files/styles/large/public/2022-10/06-STC_DJI_0060_20220726-1500x_0.jpg?itok=kvN6jsdC)
Media Name
A view of the east tie-in on Highway 29 at Halfway River. | July 2022
Caption
A view of the east tie-in on Highway 29 at Halfway River. | July 2022
Media
Image
![Aerial view of the Cache Creek bridge, showing five of seven concrete deck pours completed. | July 2022](/sites/default/files/styles/large/public/2022-10/07-STC_DJI_0068_20220726-1500x.jpg?itok=TLq474Yf)
Media Name
Aerial view of the Cache Creek bridge, showing five of seven concrete deck pours completed. | July 2022
Caption
Aerial view of the Cache Creek bridge, showing five of seven concrete deck pours completed. | July 2022
Media
Image
![The east end of the Farrell Creek bridge from the east abutment, showing temporary access ramp. | July 2022](/sites/default/files/styles/large/public/2022-10/08-STC_EVVP2612_20220726-1500x.jpg?itok=3-_YEyA6)
Media Name
The east end of the Farrell Creek bridge from the east abutment, showing temporary access ramp. | July 2022
Caption
The east end of the Farrell Creek bridge from the east abutment, showing temporary access ramp. | July 2022
Media
Image
![Crews place rebar for the Farrell Creek bridge deck. | July 2022](/sites/default/files/styles/large/public/2022-10/09-STC_EVVP2638_20220726-1500x.jpg?itok=Y7CfoY-y)
Media Name
Crews place rebar for the Farrell Creek bridge deck. | July 2022
Caption
Crews place rebar for the Farrell Creek bridge deck. | July 2022
Media
Image
![A construction worker installs rebar on the Farrell Creek bridge deck. | July 2022](/sites/default/files/styles/large/public/2022-10/010-STC_EVVP2634_20220726-1500x.jpg?itok=O0a3TKQs)
Media Name
A construction worker installs rebar on the Farrell Creek bridge deck. | July 2022
Caption
A construction worker installs rebar on the Farrell Creek bridge deck. | July 2022
Media
Image
![Panorama of the approach channel with a view of the roller compacted concrete buttress, the intake gates and spillway upper headworks. | July 2022](/sites/default/files/styles/large/public/2022-11/01-AFDE-COM-MED-01751%5B0%5D-1500x_0.jpg?itok=Un1mfvK-)
Media Name
Panorama of the approach channel with a view of the roller compacted concrete buttress, the intake gates and spillway upper headworks. | July 2022
Caption
Panorama of the approach channel with a view of the roller compacted concrete buttress, the intake gates and spillway upper headworks. | July 2022
Media
Image
![Progress on the right wall of the auxiliary spillway overflow channel. |July 2022](/sites/default/files/styles/large/public/2022-11/02-AFDE-COM-MED-01755%5B0%5D-1500x.jpg?itok=W_mJ1qoA)
Media Name
Progress on the right wall of the auxiliary spillway overflow channel. |July 2022
Caption
Progress on the right wall of the auxiliary spillway overflow channel. |July 2022
Media
Image
![Upstream, or west view, of the spillway bay and centre piers. | July 2022](/sites/default/files/styles/large/public/2022-11/03-AFDE-COM-MED-01788%5B0%5D-1500x.jpg?itok=xdotOjm4)
Media Name
Upstream, or west view, of the spillway bay and centre piers. | July 2022
Caption
Upstream, or west view, of the spillway bay and centre piers. | July 2022
Media
Image
![Spillway stilling basin divider wall, chute, and jet deflector. | July 2022](/sites/default/files/styles/large/public/2022-11/04-AFDE-COM-MED-01793%5B0%5D-1500x.jpg?itok=mpKKqjY9)
Media Name
Spillway stilling basin divider wall, chute, and jet deflector. | July 2022
Caption
Spillway stilling basin divider wall, chute, and jet deflector. | July 2022
Media
Image
![Spillway radial operating gate and guide installation. | July 2022](/sites/default/files/styles/large/public/2022-11/05-AFDE-COM-MED-01795%5B0%5D-1500x.jpg?itok=hFziaQ3I)
Media Name
Spillway radial operating gate and guide installation. | July 2022
Caption
Spillway radial operating gate and guide installation. | July 2022
Media
Image
![Configuration of the 400T crawler crane to support installation of mechanical equipment. | July 2022](/sites/default/files/styles/large/public/2022-11/06-AFDE-COM-MED-01798%5B0%5D-1500x.jpg?itok=zcz6YLbE)
Media Name
Configuration of the 400T crawler crane to support installation of mechanical equipment. | July 2022
Caption
Configuration of the 400T crawler crane to support installation of mechanical equipment. | July 2022
Order
6.00