Media
Image
![Spillways, penstocks, powerhouse and operations building. | May 2022](/sites/default/files/styles/large/public/2022-06/01-AFDE-COM-MED-01671%5B0%5D-1500x.jpg?itok=sHUK5L-_)
Media Name
Spillways, penstocks, powerhouse and operations building. | May 2022
Caption
Spillways, penstocks, powerhouse and operations building. | May 2022
Media
Image
![From left penstock units 6 through to unit 1 in varying stages of construction. | May 2022](/sites/default/files/styles/large/public/2022-06/02-AFDE-COM-MED-01655%5B0%5D-1500x.jpg?itok=iK2VApDH)
Media Name
From left penstock units 6 through to unit 1 in varying stages of construction. | May 2022
Caption
From left penstock units 6 through to unit 1 in varying stages of construction. | May 2022
Media
Image
![North facing view of the spillways. | May 2022](/sites/default/files/styles/large/public/2022-06/03-AFDE-COM-MED-01662%5B0%5D-1500x.jpg?itok=k6thxISQ)
Media Name
North facing view of the spillways. | May 2022
Caption
North facing view of the spillways. | May 2022
Media
Image
![East facing view of the approach channel under construction. | May 2022](/sites/default/files/styles/large/public/2022-06/04-AFDE-COM-MED-01665%5B0%5D-1500x.jpg?itok=Ehxyh-us)
Media Name
East facing view of the approach channel under construction. | May 2022
Caption
East facing view of the approach channel under construction. | May 2022
Media
Image
![A pre-cast concrete panel is lifted into place between piers two and three on the Farrell Creek bridge. | May 2022](/sites/default/files/styles/large/public/2022-06/05-STC_EVVP7720_20220504-1500x.jpg?itok=yl-pP7xm)
Media Name
A pre-cast concrete panel is lifted into place between piers two and three on the Farrell Creek bridge. | May 2022
Caption
A pre-cast concrete panel is lifted into place between piers two and three on the Farrell Creek bridge. | May 2022
Media
Image
![Pre-cast concrete panels have been placed between piers two and three on the Highway 29 bridge realignment at Farrell Creek. | May 2022](/sites/default/files/styles/large/public/2022-06/06-STC_DJI_0039_20220505-1500x.jpg?itok=eWWXs1tP)
Media Name
Pre-cast concrete panels have been placed between piers two and three on the Highway 29 bridge realignment at Farrell Creek. | May 2022
Caption
Pre-cast concrete panels have been placed between piers two and three on the Highway 29 bridge realignment at Farrell Creek. | May 2022
Media
Image
![Lifting a pre-cast deck panel into place on the Highway 29 Farrell Creek bridge realignment. | May 2022](/sites/default/files/styles/large/public/2022-06/07-STC_EVVP7706_20220504-1500x.jpg?itok=qMpJ-rDw)
Media Name
Lifting a pre-cast deck panel into place on the Highway 29 Farrell Creek bridge realignment. | May 2022
Caption
Lifting a pre-cast deck panel into place on the Highway 29 Farrell Creek bridge realignment. | May 2022
Media
Image
![Pre-cast concrete panels are moved into position on the Farrell Creek bridge at the Highway 29 realignment. | May 2022](/sites/default/files/styles/large/public/2022-06/08-STC_DJI_0979_20220504-1500x.jpg?itok=XoD4thzk)
Media Name
Pre-cast concrete panels are moved into position on the Farrell Creek bridge at the Highway 29 realignment. | May 2022
Caption
Pre-cast concrete panels are moved into position on the Farrell Creek bridge at the Highway 29 realignment. | May 2022
Media
Image
![An upstream view of the powerhouse and generating station, with laydown areas, temporary fishway and outlet portals. | May 2022](/sites/default/files/styles/large/public/2022-06/01-Office%20Peripherals-7-1500x.jpg?itok=lDF6mIP9)
Media Name
An upstream view of the powerhouse and generating station, with laydown areas, temporary fishway and outlet portals. | May 2022
Caption
An upstream view of the powerhouse and generating station, with laydown areas, temporary fishway and outlet portals. | May 2022
Media
Image
![Ongoing construction of the approach channel. | May 2022](/sites/default/files/styles/large/public/2022-06/02-1-1500x.jpg?itok=VKS9lwlQ)
Media Name
Ongoing construction of the approach channel. | May 2022
Caption
Ongoing construction of the approach channel. | May 2022
Media
Image
![At the dam core, near the upstream cofferdam, large orange pneumatic compactors crush glacial till which is then spread by bulldozers. | May 2022](/sites/default/files/styles/large/public/2022-06/03-24-1500x.jpg?itok=YJP3qP5C)
Media
Image
![These large concrete blocks are the stilling basin weirs used to take the energy out of the falling water. | May 2022](/sites/default/files/styles/large/public/2022-06/04-39-1500x.jpg?itok=pJe5uUHR)
Media Name
These large concrete blocks are the stilling basin weirs used to take the energy out of the falling water. | May 2022
Caption
These large concrete blocks are the stilling basin weirs used to take the energy out of the falling water. | May 2022
Media
Image
![The powerhouse and operation building are substantially complete, with foundation enhancement work ongoing in front of the tailrace. | May 2022](/sites/default/files/styles/large/public/2022-06/05-41-1500x.jpg?itok=HyAErSUC)
Media Name
The powerhouse and operation building are substantially complete, with foundation enhancement work ongoing in front of the tailrace. | May 2022
Caption
The powerhouse and operation building are substantially complete, with foundation enhancement work ongoing in front of the tailrace. | May 2022
Media
Image
![Six penstock units are in various stages of completion. | May 2022](/sites/default/files/styles/large/public/2022-06/06-53-1500x.jpg?itok=dJ0KtB64)
Media Name
Six penstock units are in various stages of completion. | May 2022
Caption
Six penstock units are in various stages of completion. | May 2022
Order
8.00