Installing reinforcement on a spiral case, to prepare for the second stage of concrete pouring. | February 2022
Media
Image
Media Name
Green cutting, or surface preparation includes freshly placed concrete which bonds the second-stage concrete pour on a draft tube cone. | February 2022
Media
Image
Media Name
Located in the powerhouse all six spiral cases are in varying stages of construction. | February 2022
Media
Image
Media Name
Protective coatings are removed from a rotor hub in preparation for assembly. | February 2022
Media
Image
Media Name
Preparing embedded piping for a second lift of concrete on spiral case unit 1. | February 2022
Media
Image
Media Name
Installing formwork before pouring the first lift of concrete on a spiral case unit 2. | February 2022
Media
Image
Media Name
Completing bulkhead and piping installation before hydrostatic testing and embedment occurs. | February 2022
Media
Image
Media Name
Along the transmission line is a midspan-splice site where the conductor reels are not long enough to complete a span. | February 2022
Media
Image
Media Name
A conductor dead-end on the transmission line. | February 2022
Media
Image
Media Name
Linemen are moving into position to dead-end the transmission line to the tower. | February 2022
Media
Image
Media Name
Installation of dead-end glass on a tower. | February 2022
Media
Image
Media Name
A crew is working on the midspan site of the transmission line. | February 2022
Media
Image
Media Name
The transmission crew is managing the conductor at the tensioner site. | February 2022
Media
Image
Media Name
A crew is inspecting the midspan splice installation on the transmission line. | February 2022
Media
Image
Media Name
The transmission crew member inspects the conductors. | February 2022
Media
Image
Media Name
Workers climbing a guyed tower to attach the conductors. | February 2022
Media
Image
Media Name
Attaching the centre-phase conductor and installing corona rings on a transmission tower. | February 2022
Media
Image
Media Name
A winter view of the spillway, penstocks, powerhouse, operations building and tail race. | February 22
Media
Image
Media Name
Foundation enhancement work and preparation at the tailrace. | February 2022
Media
Image
Media Name
Fitting the thrust ring to stay ring. | February 2022
Media
Image
Media Name
Inside the powerhouse are 6 spiral cases at various stages of completion. | February 2022
Media
Image
Media Name
Unit 2 spiral case and upper pit liner are ready for embedment into the turbine. Formwork and rebar installation begin. | February 2022
Media
Image
Media Name
Welding transition plates and water guides on a stay ring. | February 2022
Media
Image
Media Name
Preparation for second-stage concrete pour on a spiral case. | February 2022
Media
Image
Media Name
North facing view of headworks at bays 2 and 3. | February 2022
Media
Image
Media Name
Roll away preparation for the concrete pour at the spillway headworks. | February 2022
Media
Image
Media Name
Pile installation for foundation enhancement on the west spillway stilling basin. | February 2022
Media
Image
Media Name
Foundation pile sections are welded at the base of the spillway stilling basin, and rebar dowels are placed to secure concrete. | February 2022
Media
Image
Media Name
Penstock units 4 and 5. | February 2022