Media
Image
Media Name
Clearing snow on the dam upstream shell. | January 2022
Media
Image
Media Name
Six tower cranes support construction work for the intakes and spillways. | January 2022
Media
Image
Media Name
The Potain MD 3200 is the the largest crane currently used in North America and is being dismantled. | January 2022
Media
Image
Media Name
This giant tower crane is 101-metres and is capable of lifting of 80 tonnes. | January 2022
Media
Image
Media Name
This crane moved extremely heavy, oversized loads such as the penstock sections, which weighed up to 45 tonnes. | January 2022
Media
Image
Media Name
The work requiring the support of this crane is complete, and the crane will be moved so the penstock installation can occur. | January 2022
Media
Image
Media Name
The first girder is lifted onto a pier on the Farrell Creek Bridge. | January 2022
Media
Image
Media Name
There are 39 girders that will be lifted onto six piers, needed to complete Farrell Creek Bridge. | January 2022
Media
Image
Media Name
A closeup of a girder lift on the Farrell Creek Bridge. | January 2022
Media
Image
Media Name
Excavation work continues at the approach channel. | January 2022
Media
Image
Media Name
Fill material is placed in the upstream area of the dam. | January 2022
Media
Image
Media Name
Material is placed in the upstream area of the dam. | January 2022
Media
Image
Media Name
The line crew assist the helicopter to pick up the v-string insulator assembly for installation. |January 2022
Media
Image
Media Name
The helicopter flies the insulator assembly to the tower for installation. | January 2022
Media
Image
Media Name
A powerline technician attaches the cable to the insulator assembly. |January 2022
Media
Image
Media Name
The tower crew climb a tower to receive the insulator assembly. | January 2022
Media
Image
Media Name
Excavation of the approach channel continues behind the dam buttress. | January 2022
Media
Image
Media Name
Construction on the spillways including foundation enhancement and drilling of the west bay. | January 2022
Media
Image
Media Name
Upstream view of Site C dam site. | January 2022
Media
Image
Media Name
View of the approach channel dam buttress, intakes and spillways. | January 2022
Media
Image
Media Name
Panorama of the spillways, powerhouse and operations building. | January 2022