Work on the closure channel in the L3 Gully on the north bank | September 2017
Media
Image
Media Name
Slope stabilization above the closure channel in the L3 Gully on the north bank | September 2017
Media
Image
Media Name
Inclined section of the L3 Gully above closure channel on the north bank | September 2017
Media
Image
Media Name
Completed upper inclined portion of the closure channel in the L3 Gully on the north bank | September 2017
Media
Image
Media Name
Ongoing excavation on the north bank, facing southwest towards the Moberly River | September 2017
Media
Image
Media Name
Aerial view of the inlet cofferdam, the south bank excavation, and Moberly River | September 2017
Media
Image
Media Name
Aerial view of the relocated surplus excavation material area on the south bank | September 2017
Media
Image
Media Name
Curing roller-compacted concrete at the stilling basin on the south bank | September 2017
Media
Image
Media Name
Aerial view of the south bank excavation including the stilling basin and the powerhouse buttress | September 2017
Media
Image
Media Name
Roller-compacted concrete placement at the stilling basin on the south bank | September 2017
Media
Image
Media Name
Work to decommission an abandoned wellbore on the south bank | September 2017
Media
Image
Media Name
Aerial view of Septimus Siding on the south bank | September 2017