Media
Image
Media Name
Road upgrades to 271 Road | June 2017
Media
Image
Media Name
Road upgrades to Old Fort Road | June 2017
Media
Image
Media Name
Site C viewpoint | June 2017
Media
Image
Media Name
Site C viewpoint | June 2017
Media
Image
Media Name
Aggregate crushing equipment on the south bank | June 2017
Media
Image
Media Name
Aggregate crushing facility on the south bank | June 2017
Media
Image
Media Name
Excavation for the south bank approach channel | June 2017
Media
Image
Media Name
Rock slope stabilization at the stilling basin | June 2017
Media
Image
Media Name
Roller compacted concrete conveyor construction at the south bank | June 2017
Media
Image
Media Name
Aerial view of the stilling basin | June 2017
Media
Image
Media Name
Inside the temporary on-site manufacturing facility for the turbines and generators | June 2017
Media
Image
Media Name
Exterior view of the temporary on-site manufacturing facility for the turbines and generators | June 2017
Order
7.00