Media
Image
Media Name
Aerial view of the powerhouse and generating station, facing north towards the left bank. | February 2020
Media
Image
Media Name
An aerial view of powerhouse, generating station and spillway construction. | February 2020
Media
Image
Media Name
The completed inlet structure for diversion tunnel two stands 30.5 metres, or nearly 10 stories high. | February 2020
Media
Image
Media Name
Panorama view of site from the north bank facing southeast. | February 2020
Media
Image
Media Name
Site preparation is underway along Highway 29 at Halfway River for construction of 3.7 kilometres of new highway and a 1-km long bridge. | February 2020
Media
Image
Media Name
Piles are being installed across the Moberly River to catch floating debris during river diversion. Debris booms will also be installed across the Moberly River, as well as the Peace River. | February 2020