Powerhouse buttress and main service bay pad, looking upstream | August 2018
Media
Image
Media Name
Approach channel excavation on the south bank | August 2018
Media
Image
Media Name
Main service bay pad and powerhouse buttress construction on the south bank | August 2018
Media
Image
Media Name
The GSS civil works batch plant and crusher | August 2018
Media
Image
Media Name
Installation of a tower crane at the powerhouse on the south bank | August 2018
Media
Image
Media Name
Installation of the base of a tower crane at the powerhouse | August 2018
Media
Image
Media Name
Formwork for the powerhouse draft tubes tailrace on the south bank | August 2018
Media
Image
Media Name
Shotcrete application in the south bank drainage tunnel | August 2018
Media
Image
Media Name
Powerhouse buttress and GSS civil works laydown area | August 2018
Media
Image
Media Name
Transformer assembly at the substation site | August 2018
Media
Image
Media Name
Concrete pedestals and concrete being poured in forms for the substation | August 2018
Media
Image
Media Name
Substation control building steel structure on the south bank | August 2018