Media
Image
Media Name
Powerhouse and main service bay on the south bank. | December 2018
Media
Image
Media Name
Spillway excavation and powerhouse buttress (foundation) on the south bank. | December 2018
Media
Image
Media Name
Spillway excavation and powerhouse buttress (foundation) on the south bank. | December 2018
Media
Image
Media Name
Diversion tunnel outlet portal and cofferdams on the north bank. | December 2018
Media
Image
Media Name
Relocated surplus excavated material (RSEM) area on the north bank. | December 2018
Media
Image
Media Name
Inlet portal for the diversion tunnels on the north bank. | December 2018
Media
Image
Media Name
The conveyor belt corridor near the dam site: the conveyor to move materials from the 85th Avenue Industrial Lands to the dam site will be built along this right-of-way. | December 2018
Media
Image
Media Name
Concrete being pumped into a coupling chamber at the powerhouse. | December 2018
Media
Image
Media Name
Concrete being pumped into a coupling chamber at the powerhouse. | December 2018
Media
Image
Media Name
Form lift at the main service bay. | December 2018
Media
Image
Media Name
Workers installing rebar in the main service bay. | December 2018
Media
Image
Media Name
Workers installing rebar at the main service bay. | December 2018
Media
Image
Media Name
Concrete truck at one of the on-site concrete batch plants on the south bank. | December 2018
Media
Image
Media Name
One of four roadheaders being used to excavate the diversion tunnels. | December 2018
Order
1.00