Media
Image
![The first steel girders are installed for the Cache Creek bridge. | December 2021](/sites/default/files/styles/large/public/2022-01/10-STC_EV_DJI_0333-Pano_20211201-1500x.jpg?itok=I9whWCY8)
Media Name
The first steel girders are installed for the Cache Creek bridge. | December 2021
Caption
The first steel girders are installed for the Cache Creek bridge. | December 2021
Media
Image
![Wet curing and parapet heating, which will protect the surface of the Highway 29 Dry Creek bridge, is underway. | December 2021](/sites/default/files/styles/large/public/2022-01/11-STC_EV_DJI_0294_20211201-1500x.jpg?itok=tV5bGVf4)
Media Name
Wet curing and parapet heating, which will protect the surface of the Highway 29 Dry Creek bridge, is underway. | December 2021
Caption
Wet curing and parapet heating, which will protect the surface of the Highway 29 Dry Creek bridge, is underway. | December 2021
Media
Image
![Steel girder installation complete for the Highway 29 Lynx Creek bridge. | December 2021](/sites/default/files/styles/large/public/2022-01/12-STC_EV_EVVP5381_20211201-1500x.jpg?itok=jvWLrehJ)
Media Name
Steel girder installation complete for the Highway 29 Lynx Creek bridge. | December 2021
Caption
Steel girder installation complete for the Highway 29 Lynx Creek bridge. | December 2021
Media
Image
![Placing riprap and filter cloth to protect the Hudson’s Hope shoreline. | December 2021](/sites/default/files/styles/large/public/2022-01/13-STC_EV_EVVP5365_20211201-1500x.jpg?itok=NQ_GmZOL)
Media Name
Placing riprap and filter cloth to protect the Hudson’s Hope shoreline. | December 2021
Caption
Placing riprap and filter cloth to protect the Hudson’s Hope shoreline. | December 2021
Media
Image
![A worker tightens formwork with a 36-inch pipe wrench at the spillway wall. | December 2021](/sites/default/files/styles/large/public/2022-01/01-STC_EV_EVVP5919_20211203-1500x.jpg?itok=S3Y6o0Qb)
Media Name
A worker tightens formwork with a 36-inch pipe wrench at the spillway wall. | December 2021
Caption
A worker tightens formwork with a 36-inch pipe wrench at the spillway wall. | December 2021
Media
Image
![Shoring at intake unit 6 and insulation at the transition block. | December 2021](/sites/default/files/styles/large/public/2022-01/02-STC_EV_EVVP5520_20211203-1500x.jpg?itok=epN3tRNd)
Media Name
Shoring at intake unit 6 and insulation at the transition block. | December 2021
Caption
Shoring at intake unit 6 and insulation at the transition block. | December 2021
Media
Image
![Rebar, formwork and hoardings at intake unit 4. | December 2021](/sites/default/files/styles/large/public/2022-01/03-STC_EV_EVVP5659_20211203-1500x.jpg?itok=W4RmoPXk)
Media Name
Rebar, formwork and hoardings at intake unit 4. | December 2021
Caption
Rebar, formwork and hoardings at intake unit 4. | December 2021
Media
Image
![Inside the powerhouse, spiral cases unit 1 to 6 are in varying stages of construction. | December 2021](/sites/default/files/styles/large/public/2022-01/04-STC_EV_EVVP5798_20211203-1500x.jpg?itok=pfR7dRPy)
Media Name
Inside the powerhouse, spiral cases unit 1 to 6 are in varying stages of construction. | December 2021
Caption
Inside the powerhouse, spiral cases unit 1 to 6 are in varying stages of construction. | December 2021
Media
Image
![The spillways, powerhouse, and tailrace. | December 2021](/sites/default/files/styles/large/public/2022-01/05-STC_EV_EVVP5865-Pano_20211203-1500x.jpg?itok=Tsdswgde)
Media Name
The spillways, powerhouse, and tailrace. | December 2021
Caption
The spillways, powerhouse, and tailrace. | December 2021
Media
Image
![The powerhouse and tailrace. Crews recently completed construction of the powerhouse building; attention now turns to finishing the installation of the turbine-embedded parts and interior fixtures. | December 2021](/sites/default/files/styles/large/public/2022-01/06-STC_EV_EVVP5838_20211203-1500x.jpg?itok=os-5gv5i)
Media Name
The powerhouse and tailrace. Crews recently completed construction of the powerhouse building; attention now turns to finishing the installation of the turbine-embedded parts and interior fixtures. | December 2021
Caption
The powerhouse and tailrace. Crews recently completed construction of the powerhouse building; attention now turns to finishing the installation of the turbine-embedded parts and interior fixtures. | December 2021
Media
Image
![The east stilling basin and a downstream view of the spillway headworks. | December 2021](/sites/default/files/styles/large/public/2022-01/07-STC_EV_EVVP5886_20211203-1500x.jpg?itok=94e4pfwl)
Media Name
The east stilling basin and a downstream view of the spillway headworks. | December 2021
Caption
The east stilling basin and a downstream view of the spillway headworks. | December 2021
Media
Image
![Crews drill a hole to enable placement of the last foundation enhancement pile in the east stilling basin. | December 2021](/sites/default/files/styles/large/public/2022-01/08-STC_EV_EVVP5884_20211203-1500x.jpg?itok=XQYDneVj)
Media Name
Crews drill a hole to enable placement of the last foundation enhancement pile in the east stilling basin. | December 2021
Caption
Crews drill a hole to enable placement of the last foundation enhancement pile in the east stilling basin. | December 2021
Media
Image
![Crews prepare to lift a triple-girder section at the Cache Creek bridge realignment on Highway 29. | December 2021](/sites/default/files/styles/large/public/2022-01/09-Girder-placement-and-mega-cranes-1500x.jpg?itok=9GeNHez6)
Media Name
Crews prepare to lift a triple-girder section at the Cache Creek bridge realignment on Highway 29. | December 2021
Caption
Crews prepare to lift a triple-girder section at the Cache Creek bridge realignment on Highway 29. | December 2021
Media
Image
![Crews place girders for bridge piers on the Cache Creek bridge along Highway 29.| December 2021](/sites/default/files/styles/large/public/2022-01/STC_EV_20211212_HWY29_HH_BERMDJI_0909-Pano_20211214-1500x.jpg?itok=d87A39Zd)
Media Name
Crews place girders for bridge piers on the Cache Creek bridge along Highway 29.| December 2021
Caption
Crews place girders for bridge piers on the Cache Creek bridge along Highway 29.| December 2021
Media
Image
![The first girders are placed on the Cache Creek bridge along Highway 29.| December](/sites/default/files/styles/large/public/2022-01/STC_EV_EVVP6064_20211214-1500x.jpg?itok=d8xTRA2T)
Media Name
The first girders are placed on the Cache Creek bridge along Highway 29.| December
Caption
The first girders are placed on the Cache Creek bridge along Highway 29.| December
Media
Image
![Preparing the slope at the Cache Creek bridge realignment on Highway 29. | December 2021](/sites/default/files/styles/large/public/2022-01/STC_EV_20211212_HWY29_HH_BERMDJI_0911_20211214-1500x.jpg?itok=i-Sm4uXt)
Media Name
Preparing the slope at the Cache Creek bridge realignment on Highway 29. | December 2021
Caption
Preparing the slope at the Cache Creek bridge realignment on Highway 29. | December 2021
Media
Image
![A crane at the Cache Creek bridge realignment construction site prepares to install girders. | December 2021](/sites/default/files/styles/large/public/2022-01/STC_EV_20211212_HWY29_HH_BERMDJI_0926_20211214-1500x.jpg?itok=3zkckoMF)
Media Name
A crane at the Cache Creek bridge realignment construction site prepares to install girders. | December 2021
Caption
A crane at the Cache Creek bridge realignment construction site prepares to install girders. | December 2021
Media
Image
![The mid-point of the Hudson’s Hope shoreline protection berm. | December 2021](/sites/default/files/styles/large/public/2022-01/STC_EV_20211212_HWY29_HH_BERMDJI_0943_20211214-1500x.jpg?itok=sZoGrBTQ)
Media Name
The mid-point of the Hudson’s Hope shoreline protection berm. | December 2021
Caption
The mid-point of the Hudson’s Hope shoreline protection berm. | December 2021
Media
Image
![Aerial of the DA Thomas Rd. along the Hudson’s Hope shoreline protection berm. | December 2021](/sites/default/files/styles/large/public/2022-01/STC_EV_20211212_HWY29_HH_BERMDJI_0962_20211214-1500x.jpg?itok=PbObxAtS)
Media Name
Aerial of the DA Thomas Rd. along the Hudson’s Hope shoreline protection berm. | December 2021
Caption
Aerial of the DA Thomas Rd. along the Hudson’s Hope shoreline protection berm. | December 2021
Media
Image
![A north-facing panorama shows the dam core buttress, intakes and spillway structures overlooking the dam core trench. | December](/sites/default/files/styles/large/public/2022-01/20211231-1231_GSS_DCOR_A5BDJI_0053-Pano-1500x.jpg?itok=ZRB-SasR)
Media Name
A north-facing panorama shows the dam core buttress, intakes and spillway structures overlooking the dam core trench. | December
Caption
A north-facing panorama shows the dam core buttress, intakes and spillway structures overlooking the dam core trench. | December
Media
Image
![Excavating the lower benches of the approach channel. | December 2021](/sites/default/files/styles/large/public/2022-02/02-STC_EV_1231_GSS_DCOR_A5BDJI_0994_20211231-1500x_0.jpg?itok=q96vkjdH)
Media Name
Excavating the lower benches of the approach channel. | December 2021
Caption
Excavating the lower benches of the approach channel. | December 2021
Media
Image
![View of the tower crane at the spillway headworks. | December 2021](/sites/default/files/styles/large/public/2022-02/03-20211231-1231_GSS_DCOR_A5BDJI_0010-1500x_0.jpg?itok=doVeL3fW)
Media Name
View of the tower crane at the spillway headworks. | December 2021
Caption
View of the tower crane at the spillway headworks. | December 2021