Assembling 500 kV transmission tower | February 2019
Media
Image
Media Name
Maintenance on Area A crushing equipment | February 2019
Media
Image
Media Name
Generating station and spillway contractor’s (AFDE) batch plant for concrete production. | February 2019
Media
Image
Media Name
Excavation of the spillway foundation | February 2019
Media
Image
Media Name
Powerhouse main service bay and overview of L2 laydown area looking southwest | February 2019
Media
Image
Media Name
Installation of draft tube form work for Unit 1 | February 2019
Media
Image
Media Name
Looking down on Unit 3 draft tube formwork | February 2019
Media
Image
Media Name
Harris Rebar workers reviewing drawings for the main service bay area. | February 2019
Media
Image
Media Name
Looking northeast from the main service bay where rebar is being installed. | February 2019
Media
Image
Media Name
The bottom section of a spiral case being welded by a robot welder by LAR at the Voith shop on site. | February 2019