A panorama view overlooking the intake units which are components that will allow water to flow in from the reservoir. | August 2019
Media
Image
Media Name
A penstock segment travels across the temporary Peace River construction bridge to its final destination at the powerhouse. | August 2019
Media
Image
Media Name
Penstock units take shape above the Site C generating station. | August 2019
Media
Image
Media Name
This penstock welding enclosure fits over a penstock unit so workers can weld the penstock segment joints in a weather-protected space. | August 2019
Media
Image
Media Name
Construction of the unit 1 coupling chamber will connect the penstock to the turbine at the base of the powerhouse. | August 2019
Media
Image
Media Name
The unit 3 intake is being constructed to control the flow of water from the future reservoir into the penstocks and generating station. | August 2019
Media
Image
Media Name
The spillway buttress will provide a stable foundation for Site C’s two mechanical spillways and one auxiliary spillway. The spillways will allow the passage of extra large volumes of water from the reservoir into the river channel downstream. | August 20
Media
Image
Media Name
Construction of the temporary fish passage facility on the north bank, near the outlet portal of the diversion tunnels. | August 2019