Media
Image
Media Name
Looking upstream at the diverted Peace River, and the completed upstream and downstream cofferdams. | October 2020
Media
Image
Media Name
An aerial view of the south bank dam core trench looking north across the closed Peace River. | October 2020
Media
Image
Media Name
An aerial view of the Site C powerhouse, penstocks and intakes. | October 2020
Media
Image
Media Name
The completed upstream cofferdam diverts the Peace River around the main dam construction area through two tunnels in the river’s north bank. | October 2020
Media
Image
Media Name
An aerial view shows the Site C intakes, penstocks and powerhouse under construction. | October 2020
Media
Image
Media Name
Up to nine cranes are being used to build the Site C powerhouse and install the six penstocks. | October 2020
Order
3.00