Media
Image
Media Name
Panorama of the centre section of the dam excavation. | March 2021
Media
Image
Media Name
Crews remove a cofferdam in the foreground that separated the right and left bank, with the left bank core trench at top centre. | March 2021
Media
Image
Media Name
Crews have drained water from the dam core centre. Rip-rap is being placed on the downstream cofferdam. | March 2021
Media
Image
Media Name
Spillway stilling basin. | March 2021
Media
Image
Media Name
Building the formwork for the spillway pier. | March 2021
Media
Image
Media Name
Unit 2 penstock installation. | March 2021
Media
Image
Media Name
Main service bay and operations building. | March 2021
Media
Image
Media Name
Crews have commenced installation of the turbine-embedded components for Units 1 and 2 inside the powerhouse. The Unit 1 stay ring installation is underway. | March 2021
Media
Image
Media Name
An overhead view of the Unit 2 general floor and scroll case work area. | March 2021
Media
Image
Media Name
Crews install the Unit 2 turbine pit elbow liner. | March 2021
Media
Image
Media Name
The highest point of the new Halfway River bridge will be 486 metres. | March 2021
Media
Image
Media Name
Girder installation is complete, and workers remove scaffolding from the Halfway River bridge. | March 2021
Media
Image
Media Name
Construction is underway on the causeway at the east abutment of the Highway 29 realignment at Lynx Creek. | March 2021
Media
Image
Media Name
Aerial photo of the Highway 29 realignment at Lynx Creek showing work underway on the west abutment. | March 2021
Media
Image
Media Name
A panorama view of dam site excavations between the upstream and downstream cofferdams. Both cofferdams completely seal off the Peace River so that work on the earthfill dam can occur. | March 2021
Media
Image
Media Name
The downstream cofferdam in the foreground with ongoing dam excavation in the centre. Both the upstream and downstream cofferdams have been completed. | March 2021
Order
10.00