Media
Image
![A pier is tarped to protect the transition cone on the Cache Creek bridge.](/sites/default/files/styles/large/public/2021-11/2021110301-STC_EV_DJI_0577_20211103-1500x.jpg?itok=aWk_I-BK)
Media Name
A pier is tarped to protect the transition cone on the Cache Creek bridge. | November 2021
Caption
A pier is tarped to protect the transition cone on the Cache Creek bridge. | November 2021
Media
Image
![Steel girder installation is complete on the Lynx Creek bridge. | November 2021](/sites/default/files/styles/large/public/2021-11/girder-on-Lynx-1500x.jpg?itok=fd1eqEU_)
Media Name
Steel girder installation is complete on the Lynx Creek bridge. | November 2021
Caption
Steel girder installation is complete on the Lynx Creek bridge. | November 2021
Media
Image
![A lift of rebar is lowered at intake unit 6.](/sites/default/files/styles/large/public/2021-11/2021110303-IMG_3052-1500x.jpg?itok=EzkhOQO5)
Media Name
A lift of rebar is lowered at intake unit 6. | November 2021
Caption
A lift of rebar is lowered at intake unit 6. | November 2021
Media
Image
![A lift of rebar is received and unhooked from the crane.](/sites/default/files/styles/large/public/2021-11/2021110304-IMG_3056-1500x.jpg?itok=ngdib6Ou)
Media Name
A lift of rebar is received and unhooked from the crane. | November 2021
Caption
A lift of rebar is received and unhooked from the crane. | November 2021
Media
Image
![An overview of the dam core, where work continues on the upstream dam shell.](/sites/default/files/styles/large/public/2021-11/2021110305-STC_EV_EVVP3921_20211102-1500x.jpg?itok=5IxAIXQO)
Media Name
An overview of the dam core, where work continues on the upstream dam shell. | November 2021
Caption
An overview of the dam core, where work continues on the upstream dam shell. | November 2021
Media
Image
![Approximately three metres of fill material is spread over the compacted glacial till layer to stop frost from penetrating through.](/sites/default/files/styles/large/public/2021-11/2021110306-STC_EV_EVVP3983_20211102-1500x.jpg?itok=09yeaexE)
Media Name
Approximately three metres of fill material is spread over the compacted glacial till layer to stop frost from penetrating through. | November 2021
Caption
Approximately three metres of fill material is spread over the compacted glacial till layer to stop frost from penetrating through. | November 2021
Media
Image
![Dismantling the temporary access ramp to the dam and core buttress that was used for roller-compacted concrete placement.](/sites/default/files/styles/large/public/2021-11/2021110307-STC_EV_EVVP4000_20211102-1500x.jpg?itok=GLxxou7W)
Media Name
Dismantling the temporary access ramp to the dam and core buttress that was used for roller-compacted concrete placement. | November 2021
Caption
Dismantling the temporary access ramp to the dam and core buttress that was used for roller-compacted concrete placement. | November 2021
Media
Image
![Panorama of the Site C construction site, looking downstream.](/sites/default/files/styles/large/public/2021-11/2021111001-STC_EV_DJI_0639-Pano_20211110-1500x.jpg?itok=7feSxT8U)
Media Name
Panorama of the Site C construction site, looking downstream. | November 2021
Caption
Panorama of the Site C construction site, looking downstream. | November 2021
Media
Image
![The Peace River debris collection boom and barge have been removed from the river for the winter. Both will be reinstalled in the spring.](/sites/default/files/styles/large/public/2021-11/2021111002-STC_EV_DJI_0609_20211110-1500x.jpg?itok=nk_SkIN0)
Media Name
The Peace River debris collection boom and barge have been removed from the river for the winter. Both will be reinstalled in the spring. | November 2021
Caption
The Peace River debris collection boom and barge have been removed from the river for the winter. Both will be reinstalled in the spring. | November 2021
Media
Image
![A temporary ramp allows equipment to reach the higher areas of the left bank core trench abutment to complete the grouting curtain.](/sites/default/files/styles/large/public/2021-11/2021111003-STC_EV_DJI_0647_20211110-1500x.jpg?itok=cnvHELTZ)
Media Name
A temporary ramp allows equipment to reach the higher areas of the left bank core trench abutment to complete the grouting curtain. | November 2021
Caption
A temporary ramp allows equipment to reach the higher areas of the left bank core trench abutment to complete the grouting curtain. | November 2021
Media
Image
![A side view of the temporary access ramp at the left core trench abutment that allows equipment to grout the higher elevations of the abutment.](/sites/default/files/styles/large/public/2021-11/2021111004-STC_EV_DJI_0660_20211110-1500x.jpg?itok=DFi8chTD)
Media Name
A side view of the temporary access ramp at the left core trench abutment that allows equipment to grout the higher elevations of the abutment. | November 2021
Caption
A side view of the temporary access ramp at the left core trench abutment that allows equipment to grout the higher elevations of the abutment. | November 2021
Media
Image
![The remaining four (of six) Site C turbine runners arrived from São Paulo, Brazil, at the Port of Prince Rupert on November 19, 2021. | November 2021](/sites/default/files/styles/large/public/2021-11/turbine-at-prince-rupert-1500x.jpg?itok=qCaCuQS7)
Media Name
The remaining four (of six) Site C turbine runners arrived from São Paulo, Brazil, at the Port of Prince Rupert on November 19, 2021. | November 2021
Caption
The remaining four (of six) Site C turbine runners arrived from São Paulo, Brazil, at the Port of Prince Rupert on November 19, 2021. | November 2021
Media
Image
![An upstream view of the Site C construction site. | November 2021](/sites/default/files/styles/large/public/2021-12/01-STC_EV_DJI_0784_20211124-1500x.jpg?itok=DKUHhHD5)
Media Name
An upstream view of the Site C construction site. | November 2021
Caption
An upstream view of the Site C construction site. | November 2021
Media
Image
![A temporary ramp is installed higher on the left bank core trench abutment to enable completion of the grout curtain. | November 2021](/sites/default/files/styles/large/public/2021-12/02-STC_EV_DJI_0796_20211124-1500x.jpg?itok=wUSqkmoC)
Media Name
A temporary ramp is installed higher on the left bank core trench abutment to enable completion of the grout curtain. | November 2021
Caption
A temporary ramp is installed higher on the left bank core trench abutment to enable completion of the grout curtain. | November 2021
Media
Image
![Construction of the upstream shell of the dam. | November 2021](/sites/default/files/styles/large/public/2021-12/03-STC_EV_DJI_0818_20211124-1500x.jpg?itok=3PZf2BDd)
Media Name
Construction of the upstream shell of the dam. | November 2021
Caption
Construction of the upstream shell of the dam. | November 2021
Media
Image
![Spiral case installation inside the powerhouse.| November 2021](/sites/default/files/styles/large/public/2022-01/01-STC_EV_EVVP5138_20211125-1500x.jpg?itok=YsBpo6Mr)
Media Name
Spiral case installation inside the powerhouse.| November 2021
Caption
Spiral case installation inside the powerhouse.| November 2021
Media
Image
![Spiral case assembly is underway on generating unit 4. | November 2021](/sites/default/files/styles/large/public/2022-01/03-STC_EV_EVVP5176_20211125-1500x.jpg?itok=8j0Gz3iM)
Media Name
Spiral case assembly is underway on generating unit 4. | November 2021
Caption
Spiral case assembly is underway on generating unit 4. | November 2021
Media
Image
![Unit 6 draft tube cone. | November 2021](/sites/default/files/styles/large/public/2022-01/04-STC_EV_EVVP5210_20211125-1500x.jpg?itok=Vyr8RSQP)
Media Name
Unit 6 draft tube cone. | November 2021
Caption
Unit 6 draft tube cone. | November 2021
Media
Image
![The Site C penstock units in varying stages of construction. | November 2021](/sites/default/files/styles/large/public/2022-01/07-STC_EV_EVVP5314_20211125-1500x.jpg?itok=rK_eQAvO)
Media Name
The Site C penstock units in varying stages of construction. | November 2021
Caption
The Site C penstock units in varying stages of construction. | November 2021
Media
Image
![Staging the external welding platform on penstock unit 4. | November 2021](/sites/default/files/styles/large/public/2022-01/08-STC_EV_EVVP5331_20211125-1500x.jpg?itok=dXpkCLws)
Media Name
Staging the external welding platform on penstock unit 4. | November 2021
Caption
Staging the external welding platform on penstock unit 4. | November 2021
Media
Image
![Northwest view of the approach channel excavation. | November 2021](/sites/default/files/styles/large/public/2022-01/09-STC_EV_DJI_0842_20211124-1500x.jpg?itok=8AZtlbqE)
Media Name
Northwest view of the approach channel excavation. | November 2021
Caption
Northwest view of the approach channel excavation. | November 2021
Media
Image
![Approach channel | November 2021](/sites/default/files/styles/large/public/2022-02/01-%20STC_EV_DJI_0864_20211124-1500x.jpg?itok=3fgeuziJ)
Media Name
Approach channel | November 2021
Caption
Approach channel | November 2021
Order
2.00