Media
Image

Media Name
Crane mats, used to distribute weight, are placed above penstock unit 2. | August 2021
Caption
Crane mats, used to distribute weight, are placed above penstock unit 2. | August 2021
Media
Image

Media Name
Intake units 1 and 3 are substantially complete, with unit 2 under construction. The unit 4 penstock transition piece is pictured in the foreground. | August 2021
Caption
Intake units 1 and 3 are substantially complete, with unit 2 under construction. The unit 4 penstock transition piece is pictured in the foreground. | August 2021
Media
Image

Media
Image

Media Name
Backfilling with granular material is ongoing in the powerhouse yard where the elevation will be at the same level as the powerhouse floor. | August 2021
Caption
Backfilling with granular material is ongoing in the powerhouse yard where the elevation will be at the same level as the powerhouse floor. | August 2021
Media
Image

Media Name
Construction is ongoing on the spillway headworks centre pier at bay 2 and 3. | August 2021
Caption
Construction is ongoing on the spillway headworks centre pier at bay 2 and 3. | August 2021
Media
Image

Media Name
Material is removed from the upstream side of the dam core trench. | August 2021
Caption
Material is removed from the upstream side of the dam core trench. | August 2021
Media
Image

Media Name
There is a lot of activity happening in the dam core trench, including drying glacial till, cleaning the bedrock layer and placing filters and aggregates. | August 2021
Caption
There is a lot of activity happening in the dam core trench, including drying glacial till, cleaning the bedrock layer and placing filters and aggregates. | August 2021
Media
Image

Media Name
Moving material near the dam and core roller-compacted concrete buttress. | August 2021
Caption
Moving material near the dam and core roller-compacted concrete buttress. | August 2021
Media
Image

Media Name
Bedrock is mapped before backfilling. | August 2021
Caption
Bedrock is mapped before backfilling. | August 2021
Media
Image

Media Name
Formwork installation on the eastern spillway wall. | August 2021
Caption
Formwork installation on the eastern spillway wall. | August 2021
Media
Image

Media Name
Spillway headworks underway. | August 2021
Caption
Spillway headworks underway. | August 2021
Media
Image

Media Name
Tying rebar is one of the final steps before paving of the Halfway River bridge on Highway 29. | August 2021
Caption
Tying rebar is one of the final steps before paving of the Halfway River bridge on Highway 29. | August 2021
Media
Image

Media Name
It took 2,300 cubic metres of concrete poured in 13 segments, to complete the deck of the Halfway River bridge. | August 2021
Caption
It took 2,300 cubic metres of concrete poured in 13 segments, to complete the deck of the Halfway River bridge. | August 2021
Media
Image

Media Name
The concrete needed for the Halfway River bridge is made at site and transported to the bridge where it is pumped onto the bridge deck. | August 2021
Caption
The concrete needed for the Halfway River bridge is made at site and transported to the bridge where it is pumped onto the bridge deck. | August 2021
Media
Image

Media Name
View of the nearly complete Halfway River bridge for the Highway 29 realignment. | August 2021
Caption
View of the nearly complete Halfway River bridge for the Highway 29 realignment. | August 2021
Media
Image

Media Name
View of the recently completed east abutment concrete of the Farrell Creek road realignment along Highway 29. | August 2021
Caption
View of the recently completed east abutment concrete of the Farrell Creek road realignment along Highway 29. | August 2021
Media
Image

Media Name
Placement of the granular sub-base for the Farrell Creek road realignment along Highway 29. | August 2021
Caption
Placement of the granular sub-base for the Farrell Creek road realignment along Highway 29. | August 2021
Media
Image

Media Name
Structural steel is installed for the Highway 29 Dry Creek bridge realignment. | August 2021
Caption
Structural steel is installed for the Highway 29 Dry Creek bridge realignment. | August 2021
Media
Image

Media Name
Steel cross-bracing is installed between the Dry Creek bridge girders. | August 2021
Caption
Steel cross-bracing is installed between the Dry Creek bridge girders. | August 2021
Media
Image

Media Name
Construction of the concrete piers for the Lynx Creek bridge along Highway 29. | August 2021
Caption
Construction of the concrete piers for the Lynx Creek bridge along Highway 29. | August 2021
Media
Image

Media Name
Aerial view of the Hudson’s Hope shoreline protection berm. | August 2021
Caption
Aerial view of the Hudson’s Hope shoreline protection berm. | August 2021
Media
Image

Media Name
An excavator at the bottom of the DA Thomas Road hill piles riprap on the Hudson’s Hope shoreline protection berm. | August 2021
Caption
An excavator at the bottom of the DA Thomas Road hill piles riprap on the Hudson’s Hope shoreline protection berm. | August 2021
Media
Image

Media Name
The middle section of Hudson’s Hope shoreline protection berm has a completed toe berm and fill and is ready for riprap placement. | August 2021
Caption
The middle section of Hudson’s Hope shoreline protection berm has a completed toe berm and fill and is ready for riprap placement. | August 2021
Media
Image

Media Name
Glacial till is extracted at the 85th Avenue Industrial Lands and sent by conveyor belt to the dam site. | August 2021
Caption
Glacial till is extracted at the 85th Avenue Industrial Lands and sent by conveyor belt to the dam site. | August 2021
Media
Image

Media Name
Aerial view of the till conveyor and glacial till feeders. | August 2021
Caption
Aerial view of the till conveyor and glacial till feeders. | August 2021
Media
Image

Media Name
This mechanically stabilized earth wall is part of the updated conveyor loading system. Mine trucks drive on top to dump glacial till into the hopper. | August 2021
Caption
This mechanically stabilized earth wall is part of the updated conveyor loading system. Mine trucks drive on top to dump glacial till into the hopper. | August 2021
Media
Image

Media Name
Shear pile work is happening on the Cache Creek bridge segment of the Highway 29 realignment. | August 2021
Caption
Shear pile work is happening on the Cache Creek bridge segment of the Highway 29 realignment. | August 2021
Media
Image

Media Name
Bridge concrete work progresses, following formwork removal at Cache Creek. | August 2021
Caption
Bridge concrete work progresses, following formwork removal at Cache Creek. | August 2021
Media
Image

Media Name
Bridge pier construction at Farrell Creek. | August 2021
Caption
Bridge pier construction at Farrell Creek. | August 2021
Media
Image

Media Name
This is a power cap construction platform for the Farrell Creek bridge. | August 2021
Caption
This is a power cap construction platform for the Farrell Creek bridge. | August 2021
Media
Image

Media Name
This is a power cap construction platform for the Farrell Creek bridge. | August 2021
Caption
This is a power cap construction platform for the Farrell Creek bridge. | August 2021
Media
Image

Media Name
With the steel in place for the Dry Creek Highway 29 realignment, the next step is to install the precast concrete deck sections. | August 2021
Caption
With the steel in place for the Dry Creek Highway 29 realignment, the next step is to install the precast concrete deck sections. | August 2021
Media
Image

Media Name
The Lynx Creek Highway 29 realignment subgrade construction includes a detour and future highway embankment. | August 2021
Caption
The Lynx Creek Highway 29 realignment subgrade construction includes a detour and future highway embankment. | August 2021
Media
Image

Media Name
The Lynx Creek Highway 29 realignment subgrade construction includes a detour and future highway embankment. | August 2021
Caption
The Lynx Creek Highway 29 realignment subgrade construction includes a detour and future highway embankment. | August 2021
Media
Image

Media Name
Aerial view of the earthfill dam, approach channel and roller compacted concrete ramp, dam and core buttress, and powerhouse and spillways. | August 2021
Caption
Aerial view of the earthfill dam, approach channel and roller compacted concrete ramp, dam and core buttress, and powerhouse and spillways. | August 2021
Media
Image

Media Name
The earthfill dam continues to take shape, with the generating station and spillways under construction in the background. | August 2021
Caption
The earthfill dam continues to take shape, with the generating station and spillways under construction in the background. | August 2021
Media
Image

Media Name
Penstock unit 4 is the last of the six penstock units to be constructed. | August 2021
Caption
Penstock unit 4 is the last of the six penstock units to be constructed. | August 2021
Media
Image

Media Name
The six Site C generating units are in varying stages of installation. | August 2021
Caption
The six Site C generating units are in varying stages of installation. | August 2021
Media
Image

Media Name
Welding and spiral case installation on unit 2 in the powerhouse. | August 2021
Caption
Welding and spiral case installation on unit 2 in the powerhouse. | August 2021
Media
Image

Media Name
Installation of spiral case segments on unit 3 in the powerhouse. | August 2021
Caption
Installation of spiral case segments on unit 3 in the powerhouse. | August 2021
Media
Image

Media Name
Installation of the lower pit liner and thrust section on unit 4 in the powerhouse. | August 2021
Caption
Installation of the lower pit liner and thrust section on unit 4 in the powerhouse. | August 2021
Media
Image

Media Name
Embedding the draft tube elbow on unit 5 in the powerhouse. | August 2021
Caption
Embedding the draft tube elbow on unit 5 in the powerhouse. | August 2021
Media
Image

Media Name
Preparing to install the draft tube liner on unit 6 in the powerhouse. | August 2021
Caption
Preparing to install the draft tube liner on unit 6 in the powerhouse. | August 2021
Media
Image

Media Name
Installation of the working platform and formwork at the Cache Creek bridge for the Highway 29 realignment. | August 2021
Caption
Installation of the working platform and formwork at the Cache Creek bridge for the Highway 29 realignment. | August 2021
Media
Image

Media Name
Installation of the working platform and formwork at the Cache Creek bridge for the Highway 29 realignment. | August 2021
Caption
Installation of the working platform and formwork at the Cache Creek bridge for the Highway 29 realignment. | August 2021
Media
Image

Media Name
View of the embankment at the Lynx Creek segment on Highway 29. | August 2021
Caption
View of the embankment at the Lynx Creek segment on Highway 29. | August 2021
Media
Image

Media Name
View of the embankment at the Lynx Creek segment on Highway 29. | August 2021
Caption
View of the embankment at the Lynx Creek segment on Highway 29. | August 2021
Media
Image

Order
5.00