Document Library nav
Document Library
Engineering and Technical Reports
KPMG LLP: Review of Financial Model and Capital Cost Estimate Assumptions and Methodology
PDF • 126.11 KB
KPMG LLP: Site C Clean Energy Project – Project Review
PDF • 50.21 KB
Mark P. Gilbert LLC: Review of BC Hydro Electric Load Forecast
PDF • 540.75 KB
Synapse Energy Economics Inc.: Review of BC Hydro’s Alternatives Assessment Methodology
PDF • 177.03 KB
KPMG LLP: Site C – Commentary Letter
PDF • 463.92 KB
Download all ZIP • 3.38 MB
1. March 2017 Highway 29 Bear Flat / Cache Creek Summary of design work – 1981 through 2017
PDF • 1.77 MB
3. 2009 Report – Highway 29 Relocations Report – Klohn Crippen Berger /SNC Lavallin with Urban Systems Ltd
PDF • 18.6 MB
5. April 2012 Report 2– Highway 29 Definition Design Report – R.F. Binnie & Associates
PDF • 16.16 MB
6. 2010 Report – Highway 29 Options – Urban Systems Ltd
PDF • 3.87 MB
Peace River Site C Hydro Project – Reservoir Shoreline Impacts: Methodology and Criteria
PDF • 694.1 KB