Preparation for the start of tunnelling at the drainage tunnel on the south bank. (January 2017)
File Name
Rock tests for the drainage tunnel on the south bank. (January 2017)
File Name
Completed Moberly River construction bridge. (January 2017)
File Name
Construction of the main civil works equipment maintenance facility on the south bank. (January 2017)
File Name
Construction of the main civil works equipment maintenance facility on the south bank. (January 2017)
File Name
Construction of the main civil works equipment maintenance facility on the south bank. (January 2017)
File Name
Excavation continues for the south bank approach channel. (January 2017)
File Name
Excavation for the powerhouse on the south bank. (February 2017)
File Alt
Excavation for the powerhouse on the south bank. (February 2017)
File Name
Worker cutting logs for future transport to local mills. (March 2017)
File Alt
Worker cutting logs for future transport to local mills. (March 2017)
File Name
Construction of the toe berm to remediate the tension crack on the north bank. (March 2017)
File Alt
Construction of the toe berm to remediate the tension crack on the north bank. (March 2017)
File Name
Aerial view of remediation for the tension crack on the north bank. (March 2017)
File Alt
Aerial view of remediation for the tension crack on the north bank. (March 2017)
File Name
Aerial view of remediation for the tension crack on the north bank. (March 2017)
File Alt
Aerial view of remediation for the tension crack on the north bank. (March 2017)
File Name
Preparation for the Site C substation on the south bank. (March 2017)
File Alt
Preparation for the Site C substation on the south bank. (March 2017)
File Name
Constructing a temporary bridge to Tea Island. (March 2017)
File Alt
Constructing a temporary bridge to Tea Island. (March 2017)
File Name
Moving material over the Moberly River construction bridge. (March 2017)
File Alt
Moving material over the Moberly River construction bridge. (March 2017)
File Name
Grading and building the south bank initial access road. (March 2017)
File Alt
Grading and building the south bank initial access road. (March 2017)
File Name
Grading and building the south bank initial access road. (March 2017)
File Alt
Grading and building the south bank initial access road. (March 2017)
File Name
Constructing a temporary ice bridge across the Moberly River. (March 2017)
File Alt
Constructing a temporary ice bridge across the Moberly River. (March 2017)
File Name
Clearing on Tea Island. (April 2017)
File Name
Excavation for the foundations of the temporary manufacturing facility for the turbines and generators contractor. (April 2017)
File Name
Riprap placement along the south bank cofferdam. (April 2017)
File Name
North bank excavation, looking south east. (May 2017)
File Name
North bank excavation, looking south east. (May 2017)
File Name
Completed Site C worker accommodation lodge. (May 2017)
File Name
On site road work on the north bank. (May 2017)
File Name
South bank approach channel and buttress excavation. (May 2017)
File Name
South bank approach channel and buttress excavation. (May 2017)
File Name
South bank cofferdam, excavation, and sediment storage area.(May 2017)
File Name
South bank excavation. (May 2017)
File Name
South bank drainage tunnel. (May 2017)
File Name
View of the site from the south bank. (May 2017)
File Name
Geotechnical investigations on the north bank. (May 2017)
File Name
Aerial view of the excavation on the north bank. (July 2017)
File Name
Aerial view of the north bank. (July 2017)
File Name
Aggregate crushing equipment on the south bank. (July 2017)
File Name
Aggregate crushing facility on the south bank. (July 2017)
File Name
Aggregate crushing facility on the south bank. (July 2017)
File Name
Road upgrades to 271 Road. (June 2017)
File Name
Road upgrades to Old Fort Road. (June 2017)
File Name
Site C viewpoint. (June 2017)
File Name
Site C viewpoint. (June 2017)
File Name
Aggregate crushing equipment on the south bank. (June 2017)
File Name
Aggregate crushing facility on the south bank. (June 2017)
File Name
Excavation for the south bank approach channel . (June 2017)
File Name
Rock slope stabilization at the stilling basin. (June 2017)
File Name
Roller compacted concrete conveyor construction at the south bank. (June 2017)
File Name
Aerial view of the stilling basin. (June 2017)
File
File Name
Inside the temporary on-site manufacturing facility for the turbines and generators. (June 2017)
File Name
Exterior view of the temporary on-site manufacturing facility for the turbines and generators. (June 2017)
File Name
Aerial view of the L3 gully area on the north bank. (August 2017)
File Alt
Aerial view of the L3 gully area on the north bank. (August 2017)
File Name
Aerial view of the north bank diversion inlet portal and dam core areas. (August 2017)
File Alt
Aerial view of the north bank diversion inlet portal and dam core areas. (August 2017)
File Name
Tunnelling equipment on the north bank. (August 2017)
File Alt
Tunnelling equipment on the north bank. (August 2017)
File Name
North bank sediment pond. (August 2017)
File Alt
North bank sediment pond. (August 2017)
File Name
Road upgrades on 271 Road. (August 2017)
File Alt
Road upgrades on 271 Road. (August 2017)
File Name
South bank stilling basin construction. (August 2017)
File Alt
South bank stilling basin construction. (August 2017)
File Name
Aerial view of Septimus Siding on the south bank. (September 2017)
File Alt
Aerial view of Septimus Siding on the south bank. (September 2017)
File Name
Roller-compacted concrete placement at the stilling basin on the south bank. (September 2017)
File Alt
Roller-compacted concrete placement at the stilling basin on the south bank. (September 2017)
File Name
Aerial view of the south bank excavation including the stilling basin and the powerhouse buttress. (September 2017)
File Alt
Aerial view of the south bank excavation including the stilling basin and the powerhouse buttress. (September 2017)
File Name
Curing roller-compacted concrete at the stilling basin on the south bank. (September 2017)
File Alt
Curing roller-compacted concrete at the stilling basin on the south bank. (September 2017)
File Name
Aerial view of the relocated surplus excavation material area on the south bank. (September 2017)
File Alt
Aerial view of the relocated surplus excavation material area on the south bank. (September 2017)
File
File Name
Aerial view of the inlet cofferdam, the south bank excavation, and Moberly River. (September 2017)
File Alt
Aerial view of the inlet cofferdam, the south bank excavation, and Moberly River. (September 2017)
File
File Name
Ongoing excavation on the north bank, facing southwest towards the Moberly River. (September 2017)
File Alt
Ongoing excavation on the north bank, facing southwest towards the Moberly River. (September 2017)
File Name
Completed upper inclined portion of the closure channel in the L3 gully on the north bank. (September 2017)
File Alt
Completed upper inclined portion of the closure channel in the L3 gully on the north bank. (September 2017)
File Name
Inclined section of the L3 gully above closure channel on the north bank. (September 2017)
File Alt
Inclined section of the L3 gully above closure channel on the north bank. (September 2017)
File
File Name
Slope stabilization above the closure channel in the L3 gully on the north bank. (September 2017)
File Alt
Slope stabilization above the closure channel in the L3 gully on the north bank. (September 2017)
File Name
Work on the closure channel in the L3 gully on the north bank. (September 2017)
File Alt
Work on the closure channel in the L3 gully on the north bank. (September 2017)
File Name
Dredging of the river on the north bank. (October 2017)
File Alt
Dredging of the river on the north bank. (October 2017)
File Name
View of a completed slope in a laydown area on the north bank, with silt fencing installed and hydro seeding completed to prevent erosion. (October 2017)
File Alt
View of a completed slope in a laydown area on the north bank, with silt fencing installed and hydro seeding completed to prevent erosion. (October 2017)
File Name
Security fencing at 85th Avenue. (October 2017)
File Alt
Security fencing at 85th Avenue. (October 2017)
File Name
Completed upgrades to 271 Road. (October 2017)
File Alt
Completed upgrades to 271 Road. (October 2017)
File Name
Aerial view of south bank excavation. (October 2017)
File Alt
Aerial view of south bank excavation. (October 2017)
File Name
Designated area for aggregate stockpiles on the south bank. (October 2017)
File Alt
Designated area for aggregate stockpiles on the south bank. (October 2017)
File Name
Workers at the designated area for aggregate stockpiles on the south bank. (October 2017)
File Alt
Workers at the designated area for aggregate stockpiles on the south bank. (October 2017)
File Name
Completed upgrades to Old Fort Road. (October 2017)
File Alt
Completed upgrades to Old Fort Road. (October 2017)
File Name
Security fencing at 85th Avenue (November 2017)
File Alt
Security fencing at 85th Avenue (November 2017)
File Name
Aerial view of the north bank, with starter dyke and cofferdams (November 2017)
File Alt
Aerial view of the north bank, with starter dyke and cofferdams (November 2017)
File Name
Security fencing at 85th Avenue (November 2017)
File Alt
Security fencing at 85th Avenue (November 2017)
File Name
Aerial view of the north bank, with starter dyke and cofferdams (November 2017)
File Alt
Aerial view of the north bank, with starter dyke and cofferdams (November 2017)
File
File Name
Aerial view of the north bank, with cofferdams and laydown area, looking southeast (November 2017)
File Alt
Aerial view of the north bank, with cofferdams and laydown area, looking southeast (November 2017)
File Name
Aerial view of the north bank, with cofferdams and laydown area, looking east (November 2017)
File Alt
Aerial view of the north bank, with cofferdams and laydown area, looking east (November 2017)
File Name
Batch plant area on the south bank (November 2017)
File Alt
Batch plant area on the south bank (November 2017)
File Name
Aerial view of the south bank, with relocated surplus excavated material areas (November 2017)
File Alt
Aerial view of the south bank, with relocated surplus excavated material areas (November 2017)
File Name
Area view of the south bank, looking west (November 2017)
File Alt
Area view of the south bank, looking west (November 2017)
File Name
Aerial view of the south bank, with the powerhouse and spillway buttress and approach channel excavation (November 2017)
File Alt
Aerial view of the south bank, with the powerhouse and spillway buttress and approach channel excavation (November 2017)
File Name
West Pine Quarry (November 2017)
File Alt
West Pine Quarry (November 2017)
File Name
West Pine Quarry (November 2017)
File Alt
West Pine Quarry (November 2017)
File Name
Drilling at West Pine Quarry (November 2017)
File Alt
Drilling at West Pine Quarry (November 2017)
File Name
Turbines and generators contractor assembling equipment at their work area (November 2017)
File Alt
Turbines and generators contractor assembling equipment at their work area (November 2017)
File Name
Turbines and generators contractor assembling equipment at their work area (November 2017)
File Alt
Turbines and generators contractor assembling equipment at their work area (November 2017)
File Name
Blasting at West Pine Quarry (December 2017)
File Alt
Blasting at West Pine Quarry (December 2017)
File Name
Hauling material on the south bank (December 2017)
File Alt
Hauling material on the south bank (December 2017)