Aerial view of the north bank of the Site C dam site. Temporary trailers house ATCO workers as they build a 1,600-person worker accommodation facility. (October 2015)
File Alt
Aerial Camp
File
File Name
Excavation of material; part of the left bank stabilization on the north bank of the Site C dam site. (September 2015)
File Alt
Clearing
File
File Name
Excavation of material; part of the left bank stabilization on the north bank of the Site C dam site. (September 2015)
File Alt
Clearing
File
File Name
Truck on the north bank of the Site C dam site hauling materials. (October 2015)
File Alt
Truck on north bank
File Name
Dust mitigation on the north bank of the Site C dam site. (October 2015)
File Alt
Dust Mitigation
File Name
Excavators installing screw piles at location of worker accommodation camp. (October 2015)
File Alt
Excavators
File Name
Workers from ATCO Two Rivers Lodging Group start the first cement pour on what will be the worker camp's fitness centre. (October 2015)
File Alt
First Cement Pour
File
File Name
Aerial view shows material relocation. (October 2015)
File Alt
Excavation aerial view
File
File Name
Equipment staging area on the north bank of the Site C dam site. (September 2015)
File Alt
Equipment staging area
File
File Name
Construction equipment working on new site access roads and the site preparation for the worker accommodation camp on the north bank of the Site C dam site. (August 2015)
File Alt
Site C Site
File
File Name
Temporary trailers are assembled on the north bank of the Site C dam site. (September 2015)
File Alt
Temporary Trailers
File Name
North bank stabilization at the Site C dam site. (October 2015)
File Alt
North bank stabilization
File Name
Site clearing equipment leaving the site on the north bank of the Site C dam site, with log stock pile in the background. (August 2015)
File Alt
One road out
File Name
Workers from Petrowest Construction install water line. (October 2015)
File Alt
Petrowest crew installing water line
File Name
A truck delivers a modular unit to the Site C dam site for a temporary work camp. (August 2015)
File Alt
Work shacks incoming
File Name
Crews installing foundation piles for the worker accommodation camp on the north bank of the Site C dam site. (September 2015)
File Alt
Workcamp location
File Name
Clearing and grubbing at the 269 Road turnaround. (July 2015)
File