File Name
Merchantable timber being transported to local mills (January 2018)
File Alt
Merchantable timber being transported to local mills (January 2018)
File Name
Installing conveyor equipment at the approach channel and powerhouse buttress on the south bank (January 2018)
File Alt
Installing conveyor equipment at the approach channel and powerhouse buttress on the south bank (January 2018)
File Name
Installing conveyor equipment at the approach channel and powerhouse buttress on the south bank (January 2018)
File Alt
Installing conveyor equipment at the approach channel and powerhouse buttress on the south bank (January 2018)
File Name
Transporting and installing conveyor equipment on the south bank (January 2018)
File Alt
Transporting and installing conveyor equipment on the south bank (January 2018)
File Name
Aerial view of the roller-compacted-concrete buttress on the south bank (January 2018)
File Alt
Aerial view of the roller-compacted-concrete buttress on the south bank (January 2018)
File Name
The turbines and generators contractor mobilizing material and equipment to their work area (January 2018)
File Alt
The turbines and generators contractor mobilizing material and equipment to their work area (January 2018)
File Name
The turbines and generators contractor delivering equipment to their work area (January 2018)
File Alt
The turbines and generators contractor delivering equipment to their work area (January 2018)
File Name
The turbines and generators contractor delivering equipment to their work area (January 2018)
File Alt
The turbines and generators contractor delivering equipment to their work area (January 2018)
File Name
North Bank excavation, facing northeast (February 2018)
File Alt
North Bank excavation, facing northeast (February 2018)
File Name
Aerial view of the north bank with cofferdam and excavation, facing northwest (February 2018)
File Alt
Aerial view of the north bank with cofferdam and excavation, facing northwest (February 2018)
File Name
North bank excavation, viewed from the south bank (February 2018)
File Alt
North bank excavation, viewed from the south bank (February 2018)
File
File Name
Aerial view of the south bank, facing northwest with the crusher plant in foreground (February 2018)
File Alt
Aerial view of the south bank, facing northwest with the crusher plant in foreground (February 2018)
File
File Name
Aerial view of the south bank , with generating station and spillways aggregate area (February 2018)
File Alt
Aerial view of the south bank , with generating station and spillways aggregate area (February 2018)
File Name
North bank excavation - a Hitachi 1900 is loading a 773 rock truck (February 2018)
File Alt
North bank excavation - a Hitachi 1900 is loading a 773 rock truck (February 2018)
File Name
North Road maintenance on the north bank (February 2018)
File Alt
North Road maintenance on the north bank (February 2018)
File Name
Drainage tunnel on the south bank (March 2018)
File Alt
Drainage tunnel on the south bank (March 2018)
File Name
A tram used for hauling materials in the drainage tunnel on the south bank (March 2018)
File Alt
A tram used for hauling materials in the drainage tunnel on the south bank (March 2018)
File Name
Specialized equipment for unloading railcars at Septimus siding on the south bank (March 2018)
File Alt
Specialized equipment for unloading railcars at Septimus siding on the south bank (March 2018)
File Name
Septimus siding on the south bank (March 2018)
File Alt
Septimus siding on the south bank (March 2018)
File Name
Aerial view of the crushing plant and stockpiles on the south bank (March 2018)
File Alt
Aerial view of the crushing plant and stockpiles on the south bank (March 2018)
File Name
Aerial view of the powerhouse buttress on the south bank (March 2018)
File Alt
Aerial view of the powerhouse buttress on the south bank (March 2018)
File Name
In-river works on the north bank (March 2018)
File Alt
In-river works on the north bank (March 2018)
File Name
North bank shotcrete placement above inlet portal (April 2018)
File Alt
North bank shotcrete placement above inlet portal (April 2018)
File Name
North bank shotcrete placement for the inlet portal (April 2018)
File Alt
North bank shotcrete placement for the inlet portal (April 2018)
File Name
In-river works (April 2018)
File Alt
In-river works (April 2018)
File Name
North bank excavation, looking west (April 2018)
File Alt
North bank excavation, looking west (April 2018)
File Name
North bank excavation haul road (April 2018)
File Alt
North bank excavation haul road (April 2018)
File Name
South bank RCC area (April 2018)
File Alt
South bank RCC area (April 2018)
File Name
South bank RCC area (April 2018)
File Alt
South bank RCC area (April 2018)
File Name
South bank insulation placement on the face of the RCC (April 2018)
File Alt
South bank insulation placement on the face of the RCC (April 2018)
File Name
South bank R6 laydown area (April 2018)
File Alt
South bank R6 laydown area (April 2018)
File Name
South bank crusher plant 2 and aggregate stock piles (April 2018)
File Alt
South bank crusher plant 2 and aggregate stock piles (April 2018)
File Name
South bank work in the RCC area (April 2018)
File Alt
South bank work in the RCC area (April 2018)
File Name
Concrete batch plants and aggregate stockpile on the south bank (April 2018)
File Alt
Concrete batch plants and aggregate stockpile on the south bank (April 2018)
File Name
Site preparation for the GSS civil works contractor on the south bank (April 2018)
File Alt
Site preparation for the GSS civil works contractor on the south bank (April 2018)
File Name
North bank trailer delivery and set-up for AFDE offices (April 2018)
File Alt
North bank trailer delivery and set-up for AFDE offices (April 2018)
File Name
South bank trailer delivery and set-up for AFDE offices (April 2018)
File Alt
South bank trailer delivery and set-up for AFDE offices (April 2018)
File Name
North bank trailer delivery and set-up for AFDE offices (April 2018)
File Alt
North bank trailer delivery and set-up for AFDE offices (April 2018)
File Name
North bank inlet portal cofferdam and outlet portal cofferdam (May 2018)
File Alt
North bank inlet portal cofferdam and outlet portal cofferdam (May 2018)
File Name
RCC placement for the south bank tailrace wall (May 2018)
File Alt
RCC placement for the south bank tailrace wall (May 2018)
File Name
RCC placement for the south bank powerhouse buttress (May 2018)
File Alt
RCC placement for the south bank powerhouse buttress (May 2018)
File Name
RCC placement for the south bank powerhouse buttress (May 2018)
File Alt
RCC placement for the south bank powerhouse buttress (May 2018)
File Name
Conveyor belt components delivered to the 85th Ave. Industrial Lands (May 2018)
File Alt
Conveyor belt components delivered to the 85th Ave. Industrial Lands (May 2018)
File Name
Conveyor belt components delivered to the 85th Ave. Industrial Lands (May 2018)
File Alt
Conveyor belt components delivered to the 85th Ave. Industrial Lands (May 2018)
File Name
South bank phase 2 crusher (May 2018)
File Alt
South bank phase 2 crusher (May 2018)
File Name
South bank approach channel, powerhouse buttress and spillway buttress (May 2018)
File Alt
South bank approach channel, powerhouse buttress and spillway buttress (May 2018)
File Name
South bank powerhouse buttress and spillway buttress (May 2018)
File Alt
South bank powerhouse buttress and spillway buttress (May 2018)
File Name
North bank excavation, looking upstream (May 2018)
File Alt
North bank excavation, looking upstream (May 2018)
File Name
North bank excavation and shotcrete placement, looking downstream (June 2018)
File Alt
North bank excavation and shotcrete placement, looking downstream (June 2018)
File Name
North bank shotcrete placement (June 2018)
File Alt
North bank shotcrete placement (June 2018)
File Name
North bank cofferdams, looking south (June 2018)
File Alt
North bank cofferdams, looking south (June 2018)
File Name
North bank dredging, looking downstream (June 2018)
File Alt
North bank dredging, looking downstream (June 2018)
File Name
Pouring concrete forms for the substation on the south bank (June 2018)
File Alt
Pouring concrete forms for the substation on the south bank (June 2018)
File Name
South bank batch plant and aggregate material storage (June 2018)
File Alt
South bank batch plant and aggregate material storage (June 2018)
File Name
R6 laydown area and drainage tunnel on the south bank (June 2018)
File Alt
R6 laydown area and drainage tunnel on the south bank (June 2018)
File Name
Placement of steel girders for the powerhouse buttress on the south bank (June 2018)
File Alt
Placement of steel girders for the powerhouse buttress on the south bank (June 2018)
File Name
South bank spillway buttress excavation (June 2018)
File Alt
South bank spillway buttress excavation (June 2018)
File
File Name
RCC placement and shotcrete application for the spillway buttress on the south bank (June 2018)
File Alt
RCC placement and shotcrete application for the spillway buttress on the south bank (June 2018)
File Name
South bank phase 2 crusher (June 2018)
File Alt
South bank phase 2 crusher (June 2018)
File Name
South bank phase 2 crusher (June 2018)
File Alt
South bank phase 2 crusher (June 2018)
File Name
Installation of concrete for the south bank tailrace wall (July 2018)
File Alt
Installation of concrete for the south bank tailrace wall (July 2018)
File Name
Excavation for the south bank spillway buttress (July 2018)
File Alt
Excavation for the south bank spillway buttress (July 2018)
File Name
Concrete pouring for the south bank powerhouse buttress (July 2018)
File Alt
Concrete pouring for the south bank powerhouse buttress (July 2018)
File Name
South bank phase 2 crusher plant (July 2018)
File Alt
South bank phase 2 crusher plant (July 2018)
File Name
RCC stilling basin construction on the south bank (June 2018)
File Alt
RCC stilling basin construction on the south bank (June 2018)
File Name
Powerhouse buttress and main service bay pad, looking upstream (August 2018)
File Alt
Powerhouse buttress and main service bay pad, looking upstream (August 2018)
File Name
Approach channel excavation on the south bank (August 2018)
File Alt
Approach channel excavation on the south bank (August 2018)
File Name
Main service bay pad and powerhouse buttress construction on the south bank (August 2018)
File Alt
Main service bay pad and powerhouse buttress construction on the south bank (August 2018)
File Name
The GSS civil works batch plant and crusher (August 2018)
File Alt
The GSS civil works batch plant and crusher (August 2018)
File Name
Installation of a tower crane at the powerhouse on the south bank (August 2018)
File Alt
Installation of a tower crane at the powerhouse on the south bank (August 2018)
File Name
Installation of the base of a tower crane at the powerhouse (August 2018)
File Alt
Installation of the base of a tower crane at the powerhouse (August 2018)
File Name
Formwork for the powerhouse draft tubes tailrace on the south bank (August 2018)
File Alt
Formwork for the powerhouse draft tubes tailrace on the south bank (August 2018)
File Name
Shotcrete application in the south bank drainage tunnel (August 2018)
File Alt
Shotcrete application in the south bank drainage tunnel (August 2018)
File Name
Powerhouse buttress and GSS civil works laydown area (August 2018)
File Alt
Powerhouse buttress and GSS civil works laydown area (August 2018)
File Name
Transformer assembly at the substation site (August 2018)
File Alt
Transformer assembly at the substation site (August 2018)
File Name
Concrete pedestals and concrete being poured in forms for the substation (August 2018)
File Alt
Concrete pedestals and concrete being poured in forms for the substation (August 2018)
File Name
Substation control building steel structure on the south bank (August 2018)
File Alt
Substation control building steel structure on the south bank (August 2018)
File Name
Excavating the spillway buttress area on the south bank (July 2018)
File Alt
Excavating the spillway buttress area on the south bank (July 2018)
File Name
Testing concrete on the south bank (July 2018)
File Alt
Testing concrete on the south bank (July 2018)
File Name
Trial concrete placement on the south bank (July 2018)
File Alt
Trial concrete placement on the south bank (July 2018)
File Name
Transformer delivery to the substation (July 2018)
File Alt
Transformer delivery to the substation (July 2018)
File Name
Completed powerhouse buttress on the south bank (October 2018)
File Alt
Completed powerhouse buttress on the south bank (October 2018)
File Name
Receiving riprap from West Pine Quarry at Septimus Siding (September 2018)
File Alt
Receiving riprap from West Pine Quarry at Septimus Siding (September 2018)
File Name
Roller-compacted concrete buttress for the powerhouse and construction of powerhouse units (September 2018)
File Alt
Roller-compacted concrete buttress for the powerhouse and construction of powerhouse units (September 2018)
File Name
Work on the diversion tunnel inlet portal (September 2018)
File Alt
Work on the diversion tunnel inlet portal (September 2018)
File Name
Sorting and storing aggregates (September 2018)
File Alt
Sorting and storing aggregates (September 2018)
File Name
Trucks at a concrete batch plant on the south bank (September 2018)
File Alt
Trucks at a concrete batch plant on the south bank (September 2018)
File Name
Powerhouse construction area with tower crane (September 2018)
File Alt
Powerhouse construction area with tower crane (September 2018)
File Name
Powerhouse construction area (September 2018)
File Alt
Powerhouse construction area (September 2018)
File Name
Placing concrete for the service bay (September 2018)
File Alt
Placing concrete for the service bay (September 2018)
File Name
Start of highway realignment work at Cache Creek West (October 2018)
File Alt
Start of highway realignment work at Cache Creek West (October 2018)
File Name
North bank, looking downstream (October 2018)
File Alt
North bank, looking downstream (October 2018)
File Name
North bank, looking upstream (October 2018)
File Alt
North bank, looking upstream (October 2018)
File Name
South bank, looking downstream (October 2018)
File Alt
South bank, looking downstream (October 2018)
File Name
Generating station and spillways construction team standing in the future powerhouse - Unit 1 (October 2018)
File Alt
Generating station and spillways construction team standing in the future powerhouse - Unit 1 (October 2018)
File Name
Laydown area for Highway 29 Cache Creek West construction (October 2018)
File Alt
Laydown area for Highway 29 Cache Creek West construction (October 2018)
File Name
South bank substation (October 2018)
File Alt
South bank substation (October 2018)
File Name
Excavation of diversion tunnels on the north bank (October 2018)
File Alt
Excavation of diversion tunnels on the north bank (October 2018)
File Name
Conveyor placement at the dam site (November 2018)
File Alt
Conveyor placement at the dam site (November 2018)
File Name
Tower crane assembly at the powerhouse on the south bank (November 2018)
File Alt
Tower crane assembly at the powerhouse on the south bank (November 2018)
File Name
The RCC buttress on the south bank, with the concrete insulated for winter (November 2018)
File Alt
The RCC buttress on the south bank, with the concrete insulated for winter (November 2018)
File Name
Rebar installation for the powerhouse on the south bank (November 2018)
File Alt
Rebar installation for the powerhouse on the south bank (November 2018)
File Name
Construction of the earthfill dam on the north bank (November 2018)
File Alt
Construction of the earthfill dam on the north bank (November 2018)
File Name
Truck transporting a section of a conveyor (November 2018)
File Alt
Truck transporting a section of a conveyor (November 2018)
File Name
Excavation of area next to powerhouse (November 2018)
File Alt
Excavation of area next to powerhouse (November 2018)
File Name
Concrete Placement at the powerhouse (November 2018)
File Alt
Concrete Placement at the powerhouse (November 2018)
File Name
Piece for the conveyor from 85th Avenue to the dam site (November 2018)
File Alt
Piece for the conveyor from 85th Avenue to the dam site (November 2018)
File Name
Powerhouse and main service bay on the south bank (December 2018)
File Alt
Powerhouse and main service bay on the south bank (December 2018)
File Name
Spillway excavation and powerhouse buttress (foundation) on the south bank (December 2018)
File Alt
Spillway excavation and powerhouse buttress (foundation) on the south bank (December 2018)
File Name
Contractor laydown and drainage tunnel access on the south bank, with batch plants in the background (December 2018)
File Alt
Contractor laydown and drainage tunnel access on the south bank, with batch plants in the background (December 2018)
File Name
Diversion tunnel outlet portal and cofferdams on the north bank (December 2018)
File Alt
Diversion tunnel outlet portal and cofferdams on the north bank (December 2018)
File Name
Relocated surplus excavated material (RSEM) area on the north bank (December 2018)
File Alt
Relocated surplus excavated material (RSEM) area on the north bank (December 2018)
File Name
Inlet portal for the diversion tunnels on the north bank (December 2018)
File Alt
Inlet portal for the diversion tunnels on the north bank (December 2018)
File Name
The conveyor belt corridor near the dam site: the conveyor to move materials from the 85th Avenue Industrial Lands to the dam site will be built along this right-of-way (December 2018)
File Alt
The conveyor belt corridor near the dam site: the conveyor to move materials from the 85th Avenue Industrial Lands to the dam site will be built along this right-of-way (December 2018)
File Name
Concrete being pumped into a coupling chamber at the powerhouse (December 2018)
File Alt
Concrete being pumped into a coupling chamber at the powerhouse (December 2018)
File Name
Concrete being pumped into a coupling chamber at the powerhouse (December 2018)
File Alt
Concrete being pumped into a coupling chamber at the powerhouse (December 2018)
File Name
Form lift at the main service bay (December 2018)
File Alt
Form lift at the main service bay (December 2018)
File Name
Workers installing rebar in the main service bay (December 2018)
File Alt
Workers installing rebar in the main service bay (December 2018)
File Name
Workers installing rebar at the main service bay (December 2018)
File Alt
Workers installing rebar at the main service bay (December 2018)
File Name
Concrete truck at one of the on-site concrete batch plants on the south bank (December 2018)
File Alt
Concrete truck at one of the on-site concrete batch plants on the south bank (December 2018)
File Name
One of four roadheaders being used to excavate the diversion tunnels (December 2018)
File Alt
One of four roadheaders being used to excavate the diversion tunnels (December 2018)