News & Information nav
Public advisory: use caution along the Site C project transmission line corridor
The safety of the public and our employees is our number one priority.
As part of the transmission line work, crews are working at various points along the 75-kilometre transmission line corridor between the Site C dam site and the Peace Canyon Dam. BC Hydro is asking hunters and trappers to use caution along this corridor.
To ensure safety, please watch for signs that indicate active work areas and do not hunt or shoot in areas where construction could be occurring.
This work is now underway and will continue through 2024.
For more information
Call the toll-free project line: 1 877 217 0777
sitec@bchydro.com